April 21, 2026 Minutes (full text)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Page 1
TOWN OF ELMA PLANNING BOARD
1600 Bowen Road, Elma, New York 14059
Phone: 716-652-3260
MINUTES OF REGULAR MEETING ~April 21, 2026
The Regular Meeting of the Town of Elma Planning Board, hereinafter referred to as the EPB, was held
on Tuesday, April 21, 2026, at 7:00 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York.
PRESENT: TOWN REPRESENTATIVES PRESENT
Chairman Michael Cirocco Phyllis Todoro - Town Attorney
Member Michael Cleary Raymond Balcerzak - Asst Building Inspector
Member Gregory Merkle
Member James Millard ABSENT:
Member Charles Putzbach Member Robert Waver
Alternate James Lembke James Wyzykiewicz — Town Engineer
L Approval of Regular Meeting Minutes from March 17, 2026
Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on March 17, 2026. Mr.
Merkle 2nd motion. Motion approved.
I. The meeting opened with a moment of silence for longtime resident Joe Gauthier, Sr., recognizing his
service to the community and the Elma Fire Company.
Il. — Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 611 Bullis Rd
Applicant : Lucas Cellino
The meeting focused on a site plan review for a new storage/warehouse building for Cellino Plumbing as
presented by Mike Berger from Sutton Architecture . The applicant proposes a 60” x 115° (approximately 6,900—
7,000 sq ft) pole-barn structure for material storage, truck loading/unloading, and an expanded employee parking
lot across three related parcels. The board discussed parcel configuration, building height classification (primary
vs. accessory), zoning compliance, setbacks, drainage, lighting, parking, signage, landscaping, septic location,
fire department review, wetlands, and documentation updates.
Following a review, the board determined that the new storage building will be the principal structure and the
existing house will be an accessory building, thus negating the need for a height variance.
* The board concluded they have sufficient information to grant preliminary approval. The applicant will need to
update several items on the plan before final approval is given.
+ Required updates include correcting the property address on the application, showing parking space dimensions,
detailing lighting, identifying the septic location, and obtaining a review from the fire department and the town
engineer for the drainage plan.
Page 2
Town of Elma Planning Board Minutes (4/21/2026)
Page 2
HI. Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 631 Bullis Rd
(Continued) Applicant : Lucas Cellino
The checklist:
Documentation: No variances required. Has existing business use permit
Zoning: C-2
Site & Building Details: The building will be corrugated metal with 2 shades of grey, one lighter & 1
darker. Applicant was asked to provide a survey showing the correct property lines.
Lighting: Need to provide lighting details
Parking: Adding 24 additional parking spots, and the spots will be 9’ x 20°
Drainage: Town engineer needs to approve plan
Signage: No signage on the plan. If future signage is desired, the applicant must retum to the building
department for review under size/lighting limits.
Landscaping: Landscaping is not required; need to remove conflicting plan notes unless plantings are
proposed. No new dumpsters on site
Water Service & Septic System: No new water service or septic, need to show location of septic system
on plan
Fire Department: Need to show location of fire hydrant on the plan. Need approval letter from the fire
department
. Mr. Cirocco made a motion to give preliminary site plan approval; the motion was seconded by Mr. Putzbach.
Yes-6 No-0 Motion Carried
Iv. Adjourn
Motion to adjourn at 7:39 PM by unanimous consent.
Respectfully submitted,
Barbara Blair
Elma Planning Board Secretary