Text · page 1 of 2
Read the whole document on one page (all 2 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF ELMA PLANNING BOARD 1600 Bowen Road, Elma, New York 14059 Phone: 716-652-3260 MINUTES OF REGULAR MEETING ~April 21, 2026 The Regular Meeting of the Town of Elma Planning Board, hereinafter referred to as the EPB, was held on Tuesday, April 21, 2026, at 7:00 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York. PRESENT: TOWN REPRESENTATIVES PRESENT Chairman Michael Cirocco Phyllis Todoro - Town Attorney Member Michael Cleary Raymond Balcerzak - Asst Building Inspector Member Gregory Merkle Member James Millard ABSENT: Member Charles Putzbach Member Robert Waver Alternate James Lembke James Wyzykiewicz — Town Engineer L Approval of Regular Meeting Minutes from March 17, 2026 Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on March 17, 2026. Mr. Merkle 2nd motion. Motion approved. I. The meeting opened with a moment of silence for longtime resident Joe Gauthier, Sr., recognizing his service to the community and the Elma Fire Company. Il. — Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 611 Bullis Rd Applicant : Lucas Cellino The meeting focused on a site plan review for a new storage/warehouse building for Cellino Plumbing as presented by Mike Berger from Sutton Architecture . The applicant proposes a 60” x 115° (approximately 6,900— 7,000 sq ft) pole-barn structure for material storage, truck loading/unloading, and an expanded employee parking lot across three related parcels. The board discussed parcel configuration, building height classification (primary vs. accessory), zoning compliance, setbacks, drainage, lighting, parking, signage, landscaping, septic location, fire department review, wetlands, and documentation updates. Following a review, the board determined that the new storage building will be the principal structure and the existing house will be an accessory building, thus negating the need for a height variance. * The board concluded they have sufficient information to grant preliminary approval. The applicant will need to update several items on the plan before final approval is given. + Required updates include correcting the property address on the application, showing parking space dimensions, detailing lighting, identifying the septic location, and obtaining a review from the fire department and the town engineer for the drainage plan.