Text · page 2 of 2
Read the whole document on one page (all 2 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town of Elma Planning Board Minutes (4/21/2026) Page 2 HI. Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 631 Bullis Rd (Continued) Applicant : Lucas Cellino The checklist: Documentation: No variances required. Has existing business use permit Zoning: C-2 Site & Building Details: The building will be corrugated metal with 2 shades of grey, one lighter & 1 darker. Applicant was asked to provide a survey showing the correct property lines. Lighting: Need to provide lighting details Parking: Adding 24 additional parking spots, and the spots will be 9’ x 20° Drainage: Town engineer needs to approve plan Signage: No signage on the plan. If future signage is desired, the applicant must retum to the building department for review under size/lighting limits. Landscaping: Landscaping is not required; need to remove conflicting plan notes unless plantings are proposed. No new dumpsters on site Water Service & Septic System: No new water service or septic, need to show location of septic system on plan Fire Department: Need to show location of fire hydrant on the plan. Need approval letter from the fire department . Mr. Cirocco made a motion to give preliminary site plan approval; the motion was seconded by Mr. Putzbach. Yes-6 No-0 Motion Carried Iv. Adjourn Motion to adjourn at 7:39 PM by unanimous consent. Respectfully submitted, Barbara Blair Elma Planning Board Secretary