Text · page 23 of 23
Read the whole document on one page (all 23 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Resolution — Lake Shore Water Main Replacement — Change Order #2 WHEREAS, the Town of Evans and New Frontier Excavating and Paving, Inc. entered into a contract regarding the Lake Shore Rd Water Main Replacement project; and WHEREAS, the following conditions are the circumstances for Change Order 02 pursuant to the above referenced project; 1. Replace 1,019 LF of existing chain link fence in Evans Town Park (along the Lake Shore Road frontage) with a 6 FT tall black color system chain link fence including three (3) sets of 15 FT wide double swing gates. 2. Install temporary ‘snow fence’ along the east (inland) side of Lake Shore Road in Evans Town Park. This work would only be advanced if weather conditions became unfavorable. NOW, THEREFORE, BE IT RESOLVED, the Evans Town Board authorizes Change Order 02 to increase the aforementioned contract amount in the amount of $84,787.65; and FURTHER, BE IT RESOLVED, that Supervisor Ray Ashton is authorized to sign any and all documents pursuant to Change Order #2. Roll Call Vote: