Text · page 24 of 28
Read the whole document on one page (all 28 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
kes 10 Resolution —- Change Order #1 — Muddy Creek Restoration and Erosion Control (Design and Engineering Services) WHEREAS; the Town of Evans has been awarded funding in the combined amount of $918,624 from the Environmental Protection Agency’s Great Lakes Restoration Initiative and FEMA Hazard Mitigation grants Program for erosion control, flood mitigation, coastal resilience habitat restoration and water quality improvements along Muddy Creek: and WHEREAS; CPL as the Town’s municipal engineering firm has provided design, engineer and permitting services for the project totaling $147,794 in fees with approximately 95% federal funds and 5% Town funds; and WHEREAS; CPL has now incurred unanticipated costs associated with producing a Hec-Ras Hydraulic Model as being required by NYSDEC for environmental permitting; and WHEREAS; the creation of the Muddy Creek Hec-Ras Hydraulic Model will provided a continued benefit to the Town on future projects throughout the Muddy Creek watershed; and WHEREAS: CPL has provided the attached proposed Fee Amendment dated May 19, 2026 in the amount of $40,000 for creation of the Muddy Creek Hec-Ras Model. NOW, THEREFORE, BE IT RESOLVED, that CPL’s Change Order Request #1 for the Muddy Creek Hec-Ras Model in the amount of $40,000 is hereby approved. ROLL CALL VOTE: