Text · page 27 of 29
Read the whole document on one page (all 29 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Evans Parks and Sturgeon Point Marina Master Plan Resolution — Change Order #5 (Design and Engineering Services of the Sturgeon Point Phase IIA Construction Documents) WHEREAS, the Town of Evans, through a competitive Request for Proposals process, contracted with Fisher Associates to develop the Evans Parks and Sturgeon Point Marina Master Plan and Revitalization Study (the “Master Plan”); and WHEREAS, as part of the Master Plan, Fisher Associates developed a detailed concept plan reimagining Sturgeon Point Marina as an active, year-round recreational and tourism destination within a walkable, mixed-use hamlet area, organized for phased implementation; and WHEREAS, Phase IIA of the Master Plan includes establishing new roadways, walkways, park spaces, maintenance facilities, parking areas, and the creation of future mixed-use development sites; and WHEREAS, Fisher Associates has assisted in securing funding to develop 90% construction documents for the implementation of Phase IIA of the Master Plan in the amount of $356,250 from NYS Department of State’s Local Waterfront Revitalization Program with an additional $118,750 from the Town for a total project cost of $475,000; and WHEREAS, Fisher Associates is able to provide specialized professional engineering and architectural services for improvements to the Evans Parks system based on their expertise, project background and local knowledge from continued development and implementation ofthe Master Plan; and WHEREAS, Fisher Associates has provided Change Order Request #5 dated March 27, 2026 .in the amount of $475,000 to provide additional design development and permitting support services for Phase IIA of the Sturgeon Point Marina Master Plan, progressing the project to approximately 90% Construction Documents; NOW THEREFORE BE IT RESOLVED that the Evans Parks & Sturgeon Point Master Plan Change Order Request #6 in the amount of $475,000 is hereby approved. ROLL CALL VOTE: