Text · page 28 of 29
Read the whole document on one page (all 29 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
\ ‘ x Evans Parks and Sturgeon Point Marina Master Plan Resolution — Change Order #6 (Design and Engineering Services for the Evans Waterfront Pavilion Restoration Project) WHEREAS, the Town of Evans, through a competitive Request for Proposals process, contracted with Fisher Associates to develop the Evans Parks and Sturgeon Point Marina Master Plan (the “Master Plan”); and WHEREAS, as part of the Master Plan, Fisher Associates developed preliminary plans and cost estimate for replacement of the waterfront pavilion located at Evans Town Park as well as other site improvements including landscaping and accessibility enhancements (the “Project”); and WHEREAS, Fisher Associates has assisted in securing funding in the amount of $150,000 from a Community Development Block Grant with an additional $150,000 provided by the Town for a total project cost of $300,000; and WHEREAS, Fisher Associates is able to provide specialized professional architectural services for improvements to the Evans Parks system based on their expertise, project background and local knowledge from continued development and implementation of the Master Plan; and WHEREAS, Fisher Associates has provided Change Order Request #6 dated March 27, 2026 in the amount of $10,000 to support final design, bidding and construction of the Project; NOW THEREFORE BE IT RESOLVED that the Evans Parks & Sturgeon Point Master Plan Change Order Request #6 in the amount of $10,000 is hereby approved. ROLL CALL VOTE: