OH
  W

  RETAINING WALL OR  DRAINAGE PLAN NOTES:
  OH
  W
  BUILDING FOOTING
  VARIES  1.  NO NYSDEC OR FEDERAL WETLANDS OR 100-YEAR
  OH
  W  FLOODPLAIN BOUNDARIES ARE LOCATED ON OR WITHIN THE
  VICINITY OF THIS SITE.
  OH
  W

  2.  SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS,
  OH
  W  SELECT STRUCTURAL FILL, TYP.  GEOTEXTILE DRAINAGE
  WATER, STORM, SANITARY) THAT CROSS THROUGH ANY  ARCHITECTURE & ENGINEERING
  FABRIC, WRAPPING TRENCH,  PAVEMENT AREA. LIMITS OF SELECT BACKFILL ARE SHOWN
  W/ 1FT OVERLAP AT TOP  HEREON.  255 ROUNDS AVE, BUFFALO NY 14225

  VARIES - MIN. 1FT
  OH
  W

  NYSDOT No. 2 WASHED BANK
  RUN GRAVEL  3.  A MINIMUM OF 6 INCHES OF COVER IS REQUIRED FOR ALL
  STORM SEWER PIPES LOCATED IN GRASS AREAS. A MINIMUM
  PROJECT INFORMATION
  OH
  W
  4" PERF. UNDERDRAIN-
  CONNECT TO CATCH BASIN
  OF 12 INCHES OF COVER IS REQUIRED FOR ALL STORM
  OH
  W
  (SEE PLAN FOR SIZE)  SEWER PIPES LOCATED IN PAVEMENT AREAS. STORM SEWER
  PIPE LOCATED WITHIN THE SUB-BASE OF THE PAVEMENT IS  Project Name
  OH  ST  NOT PERMITTED.  4350 SENECA STREET

  4"
  W

  4.  NO STORMWATER SHALL DRAIN ONTO ADJOINING  BUILDING ADDITION
  ST
  PROPERTIES.
  OH
  W
  Project Address

  OHW
  ST  5.  STORMWATER SYSTEMS HAVE BEEN DESIGNED FOR THE  4350 SENECA ST.
  OH
  W
  25-YEAR STORM EVENT.  WEST SENECA, NY 14224
OVERFLOW WEIR  ST

  6.  PROVIDE STONE RIP RAP AT ALL PIPE OUTLETS FROM THE  Client Name

  W
INV.=645.0

  OH
100-YR STORM ELEV.
  OH
  W

  UNDISTURBED COMPACTED
  DETENTION POND/INFILTRATION PRACTICES.  HAVENS HOLDING GROUP

  CK
  SUBGRADE, TYP.
  7.  PROVIDE EMERGENCY OVERFLOW FOR THE DETENTION

  BA
  ST

  ST
  OH

  Waves Project Number
  W
  POND/INFILTRATION PRACTICES AT THE 100-YEAR STORM

  SET
  EXISTING INFILTRATION BED  ELEVATION.

  OHW
  24001.00

  D
  NOTES:

  AR
  ST
  OH
  W
  A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
  8.  INVERT ELEVATIONS ARE SHOWN FOR ALL CULVERTS UNDER

  Y
  ST
  RECOMMENDATIONS.

  AR
  DRIVEWAYS. ALL CULVERTS UNDER DRIVEWAYS SHALL HAVE

  ' RE
  OH
  B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.  GALVANIZED END SECTIONS.

  '
  W

  38
  W

  25
  OH
  C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
  PLACEMENT AND MAXIMUM PAY LIMITS.
  INVERT = 649.0  INVERT = 663.0  OH
  W
  D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
  UD  UD
  RUN UNDERDRAIN ALONG  BE USED IN ALL UNSHEETED TRENCH AREAS.
  BACK OF FOOTING

  OHW
  OH
  UD  W
  UD  UD  UD

  PROJECT ISSUE & REVISION SCHEDULE

  UD
  UNDERDRAIN DETAIL

  UD

  UD
  UD
  5.00'

  UD
  UD
  TWO STORY BLDG.
  ADDITION  5' SIDE YARD

  UD
  (FFE:648.5)  SETBACK
  EXISTING INFILTRATION BED  2ND STORY

  07/27/26 PERMIT DRAWING
  (FFE: 662.3)

  UD

  Description
  5.14'

  Date
  G 5-2
  RA %
  1.

  DE , TY
  VA P.
  RI
  ES

  1
  ,

  #
  PROFESSIONAL STAMPS

  ST

  ST

  ST

  ST
  ST

  ST
  ST

  ST
  ST
  ST
  ST
  ST

  ST

  SHEET INFORMATION
  ST

  ST

  Issued  Scale for 22x34 Sheets
  07/28/2026 1" = 20'
  Project Status
  PERMIT - SITE PLAN
  LEGEND:
  Drawing Title
  PROPOSED FLOW PATH  DRAINAGE PLAN
  UD  PROPOSED UNDERDRAIN  Drawn By  Checked By
  ERS  JLH
  PROPOSED ADDITION
  20  0  20  40  Drawing Number

  SCALE IN FEET
  INFILTRATION BED
  C-103
  Page 14 of 84