Southtowns Record

PBA09.10.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Sep 10, 2026, 6:00 p.m.
Posted by publisher
Sep 4, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Roads and traffic, Budget and taxes, Public safety, Parks and recreation

Original document

Same meeting

Text · page 59 of 84

Read the whole document on one page (all 84 pages, each with its own heading)

Rustys_Pre-Construction - Copy  Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE  Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC  Page 9

  Summary for Subcatchment 2: Subcat 2

[46] Hint: Tc=0 (Instant runoff peak depends on dt)

Runoff  =  1.39 cfs @ 11.89 hrs, Volume=  2,309 cf, Depth> 1.58"
  Routed to Link AP2 : BASIN

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-yr Rainfall=3.14"

  Area (sf)  CN  Description
  9,291  73  Brush, Good, HSG D
  4,967  98  Paved parking, HSG D
  3,277  98  Unconnected pavement, HSG D
  17,535  85  Weighted Average
  9,291  52.99% Pervious Area
  8,243  47.01% Impervious Area
  3,277  39.75% Unconnected

  Subcatchment 2: Subcat 2
  Hydrograph

  Runoff
  1.39 cfs
  Type II 24-hr
  10-yr Rainfall=3.14"
  Runoff Area=17,535 sf
  1
  Runoff Volume=2,309 cf
  Flow (cfs)

  Runoff Depth>1.58"
  Tc=0.0 min
  CN=85

  0
  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20
  Time (hours)

  Page 59 of 84