Southtowns Record

PBA09.10.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Sep 10, 2026, 6:00 p.m.
Posted by publisher
Sep 4, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Roads and traffic, Budget and taxes, Public safety, Parks and recreation

Original document

Same meeting

Text · page 69 of 84

Read the whole document on one page (all 84 pages, each with its own heading)

Rustys_Post-Construction - Copy  Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE  Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC  Page 8

  Summary for Subcatchment 1: Subcat 1

Runoff  =  2.12 cfs @ 11.96 hrs, Volume=  4,750 cf, Depth> 3.24"
  Routed to Link AP1 : SENECA ST

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"

  Area (sf)  CN  Description
  733  73  Brush, Good, HSG D
  16,839  98  Paved parking, HSG D
  17,571  97  Weighted Average
  733  4.17% Pervious Area
  16,839  95.83% Impervious Area

  Tc Length  Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  6.0  Direct Entry,

  Subcatchment 1: Subcat 1
  Hydrograph

  Runoff
  2.12 cfs

  2
  Type II 24-hr
  25-yr Rainfall=3.84"
  Runoff Area=17,571 sf
  Runoff Volume=4,750 cf
  Flow (cfs)

  Runoff Depth>3.24"
  1
  Tc=6.0 min
  CN=97

  0
  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20
  Time (hours)

  Page 69 of 84