Southtowns Record

PBA09.10.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Sep 10, 2026, 6:00 p.m.
Posted by publisher
Sep 4, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Roads and traffic, Budget and taxes, Public safety, Parks and recreation

Original document

Same meeting

Text · page 74 of 84

Read the whole document on one page (all 84 pages, each with its own heading)

Rustys_Post-Construction - Copy  Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE  Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC  Page 13

  Summary for Subcatchment 6: Subcat 6

[46] Hint: Tc=0 (Instant runoff peak depends on dt)

Runoff  =  0.48 cfs @ 11.89 hrs, Volume=  940 cf, Depth> 3.32"
  Routed to Pond 4P : INFIL. BED SAND

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"

  Area (sf)  CN  Description
  3  73  Brush, Good, HSG D
  3,363  98  Paved parking, HSG D
  27  98  Unconnected pavement, HSG D
  3,392  98  Weighted Average
  3  0.09% Pervious Area
  3,389  99.91% Impervious Area
  27  0.79% Unconnected

  Subcatchment 6: Subcat 6
  Hydrograph

  Runoff
  0.5
  0.48 cfs

  0.45
  Type II 24-hr
  0.4
  25-yr Rainfall=3.84"
  0.35
  Runoff Area=3,392 sf
  Runoff Volume=940 cf
  Flow (cfs)

  0.3

  0.25
  Runoff Depth>3.32"
  0.2
  Tc=0.0 min
  0.15
  CN=98
  0.1

  0.05

  0
  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20
  Time (hours)

  Page 74 of 84