Text · page 28 of 83
Read the whole document on one page (all 83 pages, each with its own heading)
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Edens-Evans Marshalling Yard Project Location (describe and attach a general location map): Address: 1864 Eden Evans Center Road, Town of Evans, Erie County, New York, 14057. Tax Parcel ID: 222.00-4-13 Brief Description of Proposed Action (include purpose or need): This site was previously used by National Grid as a marshalling yard for the Gardenville-Dunkirk 141/142 Northern Section Rebuild Project (Matter No. 18-T-0561). National Grid plans to use the existing marshalling yard with minimal site improvements. The current conditions include an existing gravel area which comprises the marshalling yard is approximately 13.5 acres in size and is crossed by 73/74 transmission lines owned by National Grid. For the Proposed Action, National Grid is proposing to make minor updates to the site to use the yard as a permanent National Grid storage/marshalling facility. Grading (except for the filling of a few potholes and ruts) and below grade disturbance is not anticipated. While the existing yard is an impervious gravel area with permanent fencing and gates, National Grid expects that a few perimeter controls may be needed as part of the site upgrades. Name of Applicant/Sponsor: Telephone: n/a National Grid E-Mail: n/a Address: 330 Erie Boulevard West City/PO: State: Zip Code: Syracuse NY 13202 Project Contact (if not same as sponsor; give name and title/role): Telephone: 716-862-5167 Chris Hughes, Project Manager E-Mail: [email protected] Address: 144 Kensington Ave City/PO: State: Zip Code: Buffalo NY 14214 Property Owner (if not same as sponsor): Telephone: 716-822-5755 Union Concrete & Construction Corp E-Mail: n/a Address: 435 Meyer Road City/PO: State: Zip Code: West Seneca NY 14224 Page 1 of 15 FEAF 2026