10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 31 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
  e. Will the proposed action be constructed in multiple phases?  9 Yes 9✔ No
  i. If No, anticipated period of construction:  1  months
  ii. If Yes:
   Total number of phases anticipated
   Anticipated commencement date of phase 1 (including demolition)  month  year
   Anticipated completion date of final phase  month  year
   Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
  determine timing or duration of future phases:  9  9

  f. Does the project include new residential uses?  Yes ✔ No
  If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)  9  9
  Initial Phase
  At completion
  of all phases
  9  9  9
  g. Does the proposed action include new non-residential construction (including expansions)?  Yes ✔ No
  If Yes,
  i. Total number of structures
  ii. Dimensions (in feet) of largest proposed structure:  height;  width; and  length
  iii. Approximate extent of building space to be heated or cooled:  square feet
  h. Does the proposed action include construction or other activities that will result in the impoundment of any  Yes ✔ No
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
  If Yes,
  i. Purpose of the impoundment:
  ii. If a water impoundment, the principal source of the water:  Ground water Surface water streams 9 Other
  9 specify:

  iii. If other than water, identify the type of impounded/contained liquids and their source.

  iv. Approximate size of the proposed impoundment.  Volume:  million gallons; surface area:  acres
  v. Dimensions of the proposed dam or impounding structure:  height;  length
  vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):

  D.2. Project Operations
  a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?  Yes ✔ No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
  If Yes:
  i .What is the purpose of the excavation or dredging?
  ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
    Volume (specify tons or cubic yards):  9  9
    Over what duration of time?
  iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.

  iv. Will there be onsite dewatering or processing of excavated materials?  Yes No
  If yes, describe.  9  9

  v. What is the total area to be dredged or excavated?  acres
  vi. What is the maximum area to be worked at any one time?  acres
  vii. What would be the maximum depth of excavation or dredging?  feet
  viii. Will the excavation require blasting?  Yes  No
  ix. Summarize site reclamation goals and plan: