10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 39 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
  v. Is the project site subject to an institutional control limiting property uses?  9 Yes9  No
   If Yes, DEC site ID number:
   Describe the type of institutional control (e.g., deed restriction or easement):
   Describe any use limitations:
   Describe any engineering controls:
   Will the project affect the institutional or engineering controls in place?  9 Yes9  No
   Explain:

  E.2. Natural Resources On or Near Project Site
  a. What is the average depth to bedrock on the project site?  5  feet
  b. Are there bedrock outcroppings on the project site?  9 Yes9 ■ No
  If Yes, what proportion of the site is comprised of bedrock outcroppings?  %
  c. Predominant soil type(s) present on project site:  Brockport silty clay loam 0-8% slope  34.6  %
  ________________________
  Orpark silt loam 0-8% slope  _________%
  26.9

  ________________________
  Remsen silty clay loam 0-3% slope  _________%
  17.2

  d. What is the average depth to the water table on the project site? Average: 2.5  feet

  e. Drainage status of project site soils: 9 Well Drained:  % of site
  9 Moderately Well Drained:  % of site
  9✔ Poorly Drained  100  % of site
  f. Approximate proportion of proposed action site with slopes: 9✔ 0-10%:  94.26  % of site
  9✔ 10-15%:  3.69  % of site
  9✔ 15% or greater:  2.05  % of site
  g. Are there any unique geologic features on the project site?  9  9
  Yes  ■  No
  If Yes, describe:

  h. Surface water features.
  i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,  9■ Yes 9 No
  ponds, or lakes)?
  ii. Do any wetlands or other waterbodies adjoin the project site?  9■ Yes  No
  If Yes to either i or ii, continue. If No, skip to E.2.i.
  iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,  9■ Yes  No
  state or local agency?
  iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
   Streams:  Name 838-6  Classification C
  •  Lakes or Ponds: Name  n/a  Classification n/a
  • Wetlands:  Name  Federal Waters, Federal Waters, Federal Waters,...  Approximate Size 11.6, see Wetland Report
  • Wetland No. (if regulated by DEC)
  v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired  9 Yes9 ■ No
  waterbodies?
  If Yes, name of impaired water body/bodies and basis for listing as impaired:

  i. Is the project site in a designated Floodway?  9  9 ■ No
  Yes
  j. Is the project site in the 100-year Floodplain?  9  9
  Yes ■ No
  9  9
  k. Is the project site in the 500-year Floodplain?  Yes ■ No
  9  9
  l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?  Yes ■ No
  If Yes:
  i. Name of aquifer:

  Page 12 of 15  FEAF 2026