Southtowns Record

10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 54 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

CASE 18-T-0561

  This Order approves the EM&CP Part A filing so that
the Certificate Holder may begin establishment of the Eden-Evans
Center Road marshalling yard pursuant to the Certificate.

  THE EM&CP, COMMENTS AND RESPONSES
  As filed on August 30, 2021, and revised on
February 11, 2022, the Certificate Holder’s EM&CP Part A
identifies and defines the Part A marshalling yard, including
construction access and protective measures for wetlands.  The
standards for the EM&CP are described in the Joint Proposal and
its appendices.

DPS
  With respect to EM&CP Part A, Staff provided informal
comments requesting additional information or clarifications,
including the need for the marshalling yard, installation of
erosion and sediment controls, whether culverts would be needed,
and clarification on other aspects pertaining to fencing and
guard structure installation.  The Commission is advised that
the Certificate Holder adequately addressed all DPS Staff
comments in its February 11, 2022, revised EM&CP Part A.

NYS Thruway Authority
  NYS Thruway Authority filed comments advising the
Certificate Holder that the Project will be subject to Authority
Occupancy and Work Permit Accommodation Guidelines.  The
Certificate Holder states that the comments are unrelated to the
EM&CP Part A.  DPS Staff concurs.

  DISCUSSION AND CONCLUSION
  As noted above, DPS Staff raised various concerns and
suggestions regarding details of the proposed EM&CP Part A.  The
Certificate Holder submitted a revised EM&CP Part A containing

  -4-