Text · page 68 of 83
Read the whole document on one page (all 83 pages, each with its own heading)
the assumptions and choices made by the applicant and a statement of how the development meets the objectives of the Comprehensive Plan. Applicant Response: The Evans-Angola Comprehensive Plan (“Plan”) envisions a community that grows in measured steps. “[H]igh quality development will be encouraged in strategic locations,” while “[a]griculture will continue to be supported and preserved.” Plan p. 30. Each part of that vision depends on reliable electric service. The rezoning lets the Town and National Grid work together to keep the electric system ahead of the growth the Plan invites, on land already committed to utility use. The rezoning introduces no new use. The Property holds National Grid’s Delameter Road Substation. The substation adjoins an electric transmission corridor to the southeast and is reached by existing gravel drives from Delamater Road. It generates only periodic maintenance traffic and uses no public water or sewer service. The rezoning will also accommodate future upgrades to the station. The engineering and electrical design, scope, and timing of that work are not yet final. Any upgrade will be subject to site plan review under Zoning Law § 200-42, the LI design regulations, and the performance standards of Zoning Law § 200-26. The rezoning meets several objectives of the Comprehensive Plan: Infrastructure growth: The Plan directs the Town to “focus growth in key locations, especially where utilities exist, are underutilized, or could be expanded with minimal effort.” Plan p. 38. It asks the Town to “[i]dentify opportunities for growth that take advantage of infrastructure and key locations” and to “promote approaches to growth that better conserve infrastructure, open space and natural resources.” Id. pp. 31, 33. The Property is already dedicated to utility use and has an existing substation. Infrastructure Reliability: The Plan recognizes the foundational importance of infrastructure. It explains that water system improvements are “important to continuing to provide safe and reliable water to existing users,” and it calls on the Town to “consider the investment in infrastructure to foster economic development.” Id. p. 34. The Plan also seeks a Town of Evans that attracts young families, sustains itself as a year-round destination, revitalizes Main Street, and draws new light industrial and commercial development. Id. pp. 32- 34. Those goals each add electric demand. The rezoning supports infrastructure to enhance reliability to meet that growing demand. Utility Partnerships: Town relies on utility partners like the Erie County Water Authority, Erie County Sewer (District No. 2), and National Grid, who “provides electric service throughout the Town and Village with two transmission lines traversing the Town.” Id. p. 26. In calling for “a coordinated effort” toward “a unified vision for the future,” the Plan directs the Town to “[d]evelop a plan to extend utility services as needed to support development” 2