Text · page 70 of 83
Read the whole document on one page (all 83 pages, each with its own heading)
The rezoning advances the purposes of the Zoning Law, which include “establish[ing] zoning patterns that ensure economic extensions for sewers, water supply, waste disposal and other public utilities” and “bring[ing] about the gradual conformity and continuity of land and building uses in accordance with the objectives of the Comprehensive Plan.” Zoning Law § 200-2.J, K. Rezoning the Property brings a nonconforming utility use into conformity and positions the Town’s electric infrastructure to serve future growth. The Plan stresses that zoning changes, “whether simply regulations and intent or actual boundary changes, will need to be consistent with the Plan.” Plan p. 40. That consistency is what separates a legitimate rezoning of a single parcel from spot zoning, which singles out a small parcel “for a use classification totally different from that of the surrounding area, for the benefit of the owner of such property and to the detriment of other owners.” Rodgers v. Village of Tarrytown, 302 N.Y. 115, 123 (1951). This rezoning is not spot zoning. Parcels immediately east are zoned LI, so the zoning designation exists in the immediate proximity. Moreover, the rezoning recognizes a use that has existed on the Property for decades, carries out express goals of the Plan, and benefits all users of electricity in the Town. (g) A general statement as to how open space is to be owned and maintained, if relevant. Applicant Response: The rezoning creates no common or dedicated open space. National Grid will continue to own and maintain the entire Property, including the areas outside the station fence. (h) A development schedule indicating the approximate date when construction can be expected to begin and be completed and any stages thereof. Applicant Response: No construction is proposed as part of this rezoning. (i) A statement of the applicant’s intentions with regard to the future selling or leasing of all or portions of the proposed development. Applicant Response: National Grid owns the Property. National Grid does not intend to sell or lease the Property or any part of it. (j) Quantitative data for the following: [1] Total number and type of dwelling units, indicating distribution by dwelling unit type. [2] Calculation of the residential density and dwelling units per gross acre for the entire development. [3] Total amount of open space. [4] Proposed nonresidential floor area. Applicant Response: [1] Dwelling units None. [2] Residential density Not applicable. 4