Text · page 80 of 83
Read the whole document on one page (all 83 pages, each with its own heading)
Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Delamater Project Location (describe, and attach a location map): Brief Description of Proposed Action: Niagara Mohawk Power Corporation d/b/a National Grid (“National Grid”), is the record owner of 8175 Delamater Road, SBL 221.00 4 38 (“Property”), in the Town of Evans, where National Grid operates its Delameter Road Substation on the Property. National Grid petitions the Town Board to rezone the Property from Rural Agriculture (R-A) to Light Industrial (LI) and to amend the Official Zoning Map of the Town. The rezoning brings the Property’s zoning in line with its long-standing use. The substation has operated on the Property for decades, but the R A District does not list public utility stations among its permitted uses. The substation is therefore nonconforming. No expansion is proposed as part of this rezoning. However, under Zoning Law § 200 30.C(1), a nonconforming use may not be “enlarged or increased,” and no structure devoted to that use, conforming or not, may be “enlarged, extended, constructed, reconstructed or moved.” The LI District permits “public utility stations or exchanges” as of right. Zoning Law § 200 24.B(1)(f). Rezoning to LI, would make the existing use conforming without introducing a new use. Note site work is proposed; under Zoning Law § 200 42, future site improvements would be subject to site plan review. Name of Applicant or Sponsor: Telephone: (716) 858-3878 National Grid by Barclay Damon LLP as agent/attorney. E-Mail: [email protected] Address: 200 Delaware Avenue, Suite 1200 City/PO: State: Zip Code: Buffalo NY 14202 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If No, continue to question 2. ✔ 2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES If Yes, list agency(s) name and permit or approval: ✔ 3. a. Total acreage of the site of the proposed action? 6.78 acres b. Total acreage to be physically disturbed? 0.00 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? +/- 19.85 acres 4. Check all land uses that occur on, are adjoining or near the proposed action: □ Urban ■ Rural (non-agriculture) ■ Industrial Commercial ■ Residential (suburban) □ Forest ■ Agriculture Aquatic ■ Other(Specify): solar, water tower, railroad, cell Parkland tower Page 1 of 3 SEAF 2026