Southtowns Record

6-2-26 - Recommendation, Lead Agency, and Site Plan Approvals

Government
Town of Evans
Board
Town Board
Meeting
Jun 2, 2026
Kind
Minutes
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Housing, Parks and recreation, Public safety, Roads and traffic

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Before we begin tonight’s meeting, we have some housekeeping we need to take care of; regarding minutes from the April 22nd, 2026, public meeting. Are there any additions, corrections, or questions, or may I please have a motion to accept them as submitted. Motion: Joe Pinter Second: Madeleine Dewey Vote: all in favor

    Carried unanimously, seconded by Madeleine Dewey Vote

    Page 1 of the minutes, motion 1

  2. Chair Szewczyk: Motion carried.

    Carried

    Page 1 of the minutes, motion 2

  3. BE IT FURTHER RESOLVED, that the Planning Board hereby recommends that Town Board (as SEQR Lead Agency) approves the Preliminary Plat and issues a Negative Declaration, thereby concluding that the project will not adversely affect the natural resources of the State and/or health, safety, and welfare of the public and is consistent with social and economic considerations. Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 4 of the minutes, motion 3

  4. WHEREAS, the Evans Planning Board before them a Site Plan Review Application prepared by Tredo Engineers on behalf of Melody Meadow Estates (“the Applicant”) for a proposed expansion of the current mobile home park with supporting infrastructure and lot layout for 75 new units located at 8930 Erie Rd., Angola, NY (SBL. 235.00-2-6.1); and WHEREAS, the Planning Board seeks to commence coordinated review of this action and seeks to act as Lead Agency pursuant to the requirements of the State Environmental Quality Review Act (“SEQR”), New York State Environmental Conservation Law, Article 8 and 6 NYCRR Part 617; and WHEREAS, the Planning Board determines that it is the most appropriate agency to…

    Carried unanimously

    Page 5 of the minutes, motion 4 (full wording)

  5. 3. Site Plan – Resolution to determine SEQR declaration and to approve the proposed construction of eight (8) apartment buildings, housing eight (8) units each on a 6± acre portion of a 14± acre parcel located on North Main Street, Angola, NY. Property owners E&K Estates, LLC, SBL# 235.07-4-5. Petitioner: Metzger Civil Engineering, PLLC Background • On September 27, 2017 the Planning Board unanimously approved the site plan for

    Carried unanimously

    Page 5 of the minutes, motion 5; vote on page 6, motion 5

  6. • The Applicant shall address comments provided in the Town Engineer’s review dated May 8, 2026. • The Applicant shall perform a detailed Downstream Sewer Capacity Analysis to be submitted to the Erie County Division of Sewerage Management for approval. • The Applicant must meet all the requirements and obtain all necessary permits of the Erie County Highway Department. • The Applicant must meet all the requirements of the Erie County Water Authority. • All elements of the project will be constructed per the approved Site Plan and in compliance with the Town of Evans Code Enforcement, Planning and Engineering Department’s reviews and comments. • The applicant will c…

    Carried unanimously

    Page 8 of the minutes, motion 6 (full wording)

  7. BE IT FURTHER RESOLVED, final site plan approval and issuance of any building permits from the Town of Evans is conditioned on the successful completion of the following: • The Applicant shall address any outstanding comments provided in the Town Engineer’s review dated May 12, 2026. • The Applicant shall coordinate with NYSDOT to receive all approvals and permits to conduct work on NYS Route 5, including issuance of a Highway Work Permit for the proposed curb cut and roadside drainage. • Per Evans Town Code 70-7, any new businesses occupying the proposed units must first meet with the Director of Planning and Code Enforcement Officer to understand the nature of the business…

    Carried unanimously

    Page 11 of the minutes, motion 7 (full wording)

  8. • The Town will continue working through the Joint Application for Permitting process and receive all necessary approvals from any permitting agencies to perform the work, including the NYS Department of Environmental Conservation, the US Army Corps of Engineers, the NYS Department of State, and the NYS Office of General Services. Roll Call Vote: Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 14 of the minutes, motion 8

  9. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 22 of the minutes, motion 10

  10. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 45 of the minutes, motion 11

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Thank you everyone for joining our meeting this evening, whether in-person or remotely. May I please have a motion to adjourn. Motion: Lori Szewczyk Second: Kevin Hassen Roll Call Vote: Roll Call Vote: All in favor.

    Carried unanimously, seconded by Kevin Hassen Roll

    Page 14 of the minutes, motion 9; vote on page 15, motion 9

Text · page 56 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

William Smith
May 26, 2026
Page 2

  https://dec.ny.gov/regulatory/permits-licenses/waterways-coastlines-
  wetlands/freshwater-wetlands#Determine

  2. Please note that Big Sister Creek has a water classification and standard of C(T),
  pursuant to 6 NYCRR Part 835, Item 2. Therefore, any physical alteration (i.e. land
  clearing, filling, drainage pipe/ditch installation, etc.) to the bed or banks (within 50 feet
  of the stream) will require an Article 15, Title 5, Protection of Waters Permit from the
  NYSDEC.

  3. We have reviewed the available information in the New York State Natural Heritage
  Program databases on known occurrences of rare or state-listed animals and plants, of
  significant natural communities, and other significant habitats. Bald Eagle (Haliaeetus
  leucocphalus), a NYS listed threatened species, was last identified in 2019 year in the
  Town of Evans. For most sites, comprehensive field surveys have not been conducted.
  We cannot provide a definitive statement as to the presence or absence of all rare or
  state-listed species or significant natural communities. This information should not be
  substituted for on-site surveys that may be required for environmental impact
  assessment. Depending on the nature of the project and the conditions at the project
  site, further information from on-site surveys or other sources may be required to fully
  assess impacts on biological resources.

  4. Please recognize that this proposed project is defined as a Sanitary Sewer Extension
  and will require approval from the Erie County Department of Environment and Planning,
  Division of Sewerage Management (ECDSM), as well as approval from the Erie County
  Department of Health, 503 Kensington Avenue, Buffalo, New York 14214, telephone:
  716/961-6800, which acts as our agent and will be the approving agency. This Sanitary
  Sewer Extension project will also require stamped Professional Engineering Certification
  that the downstream capacity analysis [DSCA] and the proposed infiltration and inflow
  [I/I] mitigation work submitted for the project are in accordance with appropriate
  NYSDEC and ECDSM guidelines and standards.

  A detailed Downstream Sewer Capacity Analysis must be performed and submitted for
  the project as part of the Project’s Engineering Report. Recent wet weather flow
  monitoring data and proposed new development flow should be analyzed relative to
  theoretical capacity at key nodes in the downstream sewer system and at pump stations
  (if any) to determine if capacity exists.
  Recent wet weather system flow data can consist of:
   Comprehensive information from recent Sanitary Sewer System Evaluation
  Studies, or
   Wet weather data collected at (minimum of 3) key downstream nodes
  specified by the municipality.
  o This dated information can consist of instantaneous flow measurements
  or continuous flow or sewer depth measurements obtained during
  significant wet weather events, preferably during high groundwater
  conditions. Peak sewer flow recording methods are an acceptable
  method to collect this information.
  o Depth or flow measurements should continue until a significant wet
  weather event occurs, but would not have to extend beyond three