Text · page 57 of 74
Read the whole document on one page (all 74 pages, each with its own heading)
William Smith May 26, 2026 Page 3 months. A significant wet weather event is considered to be a daily rainfall amount of ½” or greater. The Downstream Sewer Capacity Analysis must also contain a narrative and a detailed map showing the downstream routing of sewers from the proposed project site to the Wastewater Treatment Plant. Line sizes, theoretical capacity and pump stations must be identified and included in the analysis. This Downstream Sewer Capacity Analysis, as well as any required infiltration and inflow (I/I) rehabilitation offset work at a 4:1 ratio, should be part of the Project’s Engineering Report. These items must be received as part of a complete sanitary sewer extension plan submission. The Town of Evans shall coordinate the information contained in this submission. If adequate capacity is not available, the sewer extension will not be approved until an acceptable remediation plan is developed. The above guidance will help in the preparation of a complete Sewer Extension submission, which will facilitate our review. If you have any questions or require additional information, please contact our office Division of Water, telephone: 716/851-7070 or the Erie County Health Department. 5. Since project activities will involve land disturbance of 1 acre or more, the project sponsor, owner or operator is required to obtain a State Pollutant Discharge Elimination System General Permit for Stormwater Discharges from Construction Activity (GP-0-25- 001). This General Permit requires the project sponsor, owner or operator to control stormwater runoff according to a Stormwater Pollution Prevention Plan (SWPPP), which is to be prepared prior to filing a Notice of Intent (NOI) and prior to commencement of the project. More information on General Permit GP-0-25-001, as well as information on how to electronically submit the eNOI form, is available on the NYSDEC’s website at www.dec.ny.gov/chemical/43133.html. Information on permitting requirements and preparation of a necessary Stormwater Pollution Prevention Plan (SWPPP) is available on the NYSDEC’s website at www.dec.ny.gov/chemical/8468.html. The Town of Evans is designated as an MS4 community. The project sponsor, owner or operator of a construction activity that is subject to the requirements of regulated, traditional land use control MS4 shall have their SWPPP reviewed and accepted by the MS4 community. The "MS4 SWPPP Acceptance” form must be signed by the principal executive officer or ranking elected official from the MS4 community, or by a duly authorized representative of that person, and submitted along with the eNOI to receive NYSDEC approval before construction commences. 6. A review of soils information indicates the potential for hydric soils on the project site. The project sponsor should consult with the United States Army Corps of Engineers (USACE) to determine if that agency has regulatory jurisdiction or requires approval from that agency. If federal wetlands are involved, USACE may require the project sponsor to obtain a Water Quality Certification (WQC) from NYSDEC. More information related to this requirement can be found on NYSDEC’s website at https://dec.ny.gov/regulatory/permits-licenses/waterways-coastlines-wetlands/protection- of-waters-program#Water_Quality_Certification.