Text · page 2 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
The Planning Board has discussed and reviewed the iterations of the plan at various Work Sessions over the past three years, and most recently the proposed final draft during the October 8th, December 10th, and January 14th meetings. Chairwoman Szewczyk: • We will now hear from Don Naetzker, the representative from Fisher Associates, about the updates that were made since the Planning Board Work Session on 1/14 and then open discussion with the Planning Board. o Don Naetzker gave a presentation of the parks that were updated from the last work session, as well as the concept design for Town Hall Park. The Board provided feedback for each of the discussed concepts, while also noting that this plan has been reviewed thoroughly throughout the process. • If there are no further questions or comments from the Board, I will open the floor for any public comment or question. Is there anyone who wishes to speak? • If there are no further comments from the public, does the Board have any final thoughts they wish to share? Resolution to Recommend Adoption of the Evans Parks and Sturgeon Point Marina Master Plan WHEREAS, the Town procured Fisher Associates and team of subconsultants to provide various planning, architectural, engineering, research and public outreach services required to complete the Evans Parks and Sturgeon Point Marina Master Plan; and WHEREAS, the purpose of the Master Plan is to guide the development, improvement, and maintenance of all Town of Evans’ parks, public spaces and Sturgeon Point Marina; and WHEREAS, the Planning Board has served as the primary Stakeholder Advisory Committee throughout the master planning process; and WHEREAS, the Town has received input from the local community on the Master Plan through regular public engagement, including multiple meetings, workshops and surveys; and WHEREAS, Fisher Associates have now prepared a complete draft of the Master Plan, which incorporates input received and includes conceptual plans and detailed recommendations for improvements; and WHEREAS, the Master Plan outlines responsible capital and operational investments, while emphasizing functionality, universal design, sustainability, accessibility and resiliency.