Text · page 139 of 234
Read the whole document on one page (all 234 pages, each with its own heading)
Water Line Replacements – Award Bid for Phase 1 (August 2024) 8 Bids Received – Low Bid was 716 Site Contracting for $2,415,741… Awarded the bid on 8/21/24 Engineer Costs – Phase 1 Construction Costs – Phase 1 139