Text · page 203 of 234
Read the whole document on one page (all 234 pages, each with its own heading)
Town Hall Entryway • Needed full replacement of stairs, handrails, and pillars • Bid Opening – December 2023 • 6 bids received • Low bid was Double A Services $46,525 Engineering Cost 203