Text · page 92 of 159
Read the whole document on one page (all 159 pages, each with its own heading)
Ongoing Project Summary Watermain replacement Water Consolidation Study • 1450 feet ductile iron water main along • Study started in 2021 Boston State between Meadow & Ripple • Public presentation of options held May 2023 • CDBG & ARPA funding • 98% complete Water Tank Repairs North Boston Park Shelter • Wohleuter Tank, Rice Hill & Crestwood tanks– • Shelter tear‐down and replacement all mostly done, just waiting on ECWA to bill • ARPA funding & CDBG Funding • Town issued a Bond Anticipation Note (BAN) • 95% complete for $1,013,790 on 10/6/22 & renewed it on 10/5/23 Waterline Replacements Comprehensive Plan Update • 3 Phase waterline replacement in District 1 & • Awarded Consultant 5/29/23 to CPL District 2 based on ECWA break history • Steering committee was formed, surveys • Engineering estimates started at $10.8 million have been distributed, and first public – in May 2023 they were at $15.6 million meeting has been held • Phase 1 in Engineering – hoping to be ready to bid in Winter. Engineering estimates originally slated $3.8 million for this part. The phase 1 engineering estimate has since risen EV Charging to $5 million. Phase 1 covers 10,770 linear foot in the north end of Boston • NYSERDA Grant received for $5,000 • Phase 2 & 3 will include repairs to waterline • In discussion over the NYSEG Make‐Ready & a pump station in District 1 and District 2 in Program the geographical middle & south end of town • Currently looking at options 102