Text · page 1 of 2
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
JUL 22 Pad 12 ERIE COUNTY WATER AUTHORITY 3030 Union Road « Buffalo, New York 14227 716-684-1510 * FAx 716-684-3937 July 19, 2019 The Honorable Jason Keding Supervisor of Town of Boston 8500 Boston State Rd. Boston, NY 14025 RE: 2020 Construction Projects ECWA Project No.: 199300453 Dear Supervisor Keding: In an effort to provide continual safe and affordable water to all of the citizens within your municipality, and as you prepare for your 2020 annual budget, we urge you to secure funding for capital improvement projects to your water system. I remind you that these projects are needed to avoid interruption of service, to maintain quality fire protection, and to avoid future property damage. In an effort to assist you, we have attached a list of recommendations. These recommendations are based on leak history, age of existing water lines or other infrastructure failures. We recognize that some of these projects may already be planned or possibly in the construction phase. Please advise us of these projects so that we may update our records. We appreciate your continued cooperation as we share in the delivery of quality water to all Town of Boston residents. If you have any questions or require additional information concerning these recommendations, please contact me at 716-685-8289. Sincerely, Yiitgo E” AUTHORITY fiat Keith E. Dash Municipal Liaison KED*lmb Attachment CC: R. Stoll BOTN-326-9302-F P:\TOWN\P9300453\LETTER49 (2020 Construction Proj-Lease Managed).docx