Text · page 132 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
GHD’s design teams make use of the latest technology to maximize collaboration between team members and resolve conflicts that are inherent in construction projects that can lead to unwanted change orders. Many resources are available to improve project outcomes including the ability to create 3D design models that can be shared among designers using Autodesk BIM 360. Local staff can call on subject matter experts to consult on complex issues, including for design concerns, cost estimates, and safety in design concerns. 4.3.1 Building Information Modeling (BIM) BIM is the digital representation of physical and functional characteristics of projects, assets, and environments, but it is more than a design tool—it is an avenue to create value. Data-rich BIM models are constructed using data captured from existing assets during the planning, design, and delivery process. On large and complex projects, BIM provides a clear picture of the project before it is realized to reduce costs, increase efficiencies, improve safety, and streamline processes. With this, the Town can expect greater project control, better connection with the design, reduced uncertainties, and cost overruns. 4.3.2 Safety in Design In broad terms, there are three stages in the design process that consider safety in design, including: – Concept Design: Conduct preliminary hazard identification, for hazards that are within the control of the designer. – Preliminary Design: Identify reasonably foreseeable, significant construction/manufacture, installation, commission/use, maintenance/repair, demolition and disposal hazards associated with a design project and controls to mitigate. – Detailed Design: Focusing on ways in which a design can be modified to eliminate or reduce issues that may affect the ongoing safety of persons involved in constructing, using, maintaining, or demolishing the design product. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 9 Page 132 of 301