Text · page 141 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
from a small pump station up to a 240 mgd facility. They also have experience in substation design, extensive building systems, medium voltage power systems, emergency generator systems, electrical service design, and instrumentation and control system design. Jade Stone shares GHD’s belief that we succeed when our clients succeed. We have successfully collaborated with Jade Stone on the City of Oswego WTP Upgrades, Erie County Division of Sewerage Management Lackawanna WRRF and ORF Disinfection Improvements, and the Village of Bath WWTP Upgrades projects, and many projects in Central New York. 6. Similar Project Experience and References The following pages provide an overview of GHD’s experience with wastewater collection and water distribution projects. The client references below can attest to GHD’s and our proposed team’s current and past performance on projects of a similar nature to those proposed for the Town. Detailed project descriptions demonstrating this experience are provided in Appendix B. Plant 5 Flowmetering Project and SSES Re-Evaluation Town of West Seneca | Jason Foote, Town Engineer; 716 674-2280 2025 I/I Project – SWMM Model Update Niagara County Sewer District No. 1 | Thomas W. Blodgett, PE, Administrative Director; 716 693-0001 Consent Order Compliance Town of Tonawanda | Michael Kessler, Director of Water and Wastewater; 716 693-4900 Sanitary Sewer System Evaluation and Rehabilitation Town of Grand Island | Robert H. Westfall, PE, Town Engineer; 716 773-9600 Town-wide Water System Improvements Town of Lewiston | Steve Broderick, Supervisor; 716 754-8213 Royalton Phase 16 Water System Improvements Town of Royalton | Jeffrey Brown, Supervisor; 716 772-7531 Table 6.1 highlights GHD’s collection system and I/I experience across our Northeast region. GHD | Town of West Seneca | 12681649 | Engineering Services for Water and Wastewater Projects 18 Page 141 of 301