Text · page 158 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
Jacob Kocic | Linear Assessments and Permitting West Side Interceptor Relief Pump Station & Stormwater Inspection Services Forcemain Engineer Engineer Town of Amherst | Amherst, NY, USA Town of Amherst | Amherst, NY, USA Jake provides inspection oversight of the stormwater The WSI Relief Pump Station and Forcemain protection measures for various construction projects consisted of a new wet weather overflow, new 15 mgd located in the Town of Amherst. Site inspections are sanitary sewage pump station, and over 2 miles of 24- completed at designated phases of construction to inch forcemain. Jake was responsible for assisting with verify the contractor’s compliance with the routine the detailed design including permitting and agency (7-day) inspections required by the NYSDEC and reviews and approvals, development of design compliance with the Town’s MS4 permitting. drawings and technical specifications. A critical aspect Inspections include review of the site specific SWPPP of the project was an alignment alternative evaluation and inspection of erosion and sediment control for over 2 miles of medium diameter pipeline through a measures in place at the various sites. The activities highly sub-urbanized area, with numerous utility also include coordination with the respective conflicts, land acquisition implications, and permitting contractors if any deficiencies are noted or requirements. maintenance is required of the control measures in place. Low-pressure Sanitary Sewer Design Career history Project Engineer South & Center Chautauqua Lake Sewer Districts | 2017 – present GHD, Engineer Chautauqua County, NY, USA The West Side Sewer Extension consists of extending an existing sewer district along the west side of Chautauqua Lake. New infrastructure consists of approximately 25,000 linear feet of 1-1/4‑inch HDPE, 21,000 linear feet of 2‑inch HDPE, 7,500 linear feet of 3‑inch HDPE, 1,000 linear feet of 8‑inch HDPE, 22,000 linear feet of 10‑inch HDPE, 230 grinder pumps, two new pumping stations, rehabilitation of two existing pump stations, and all associated appurtenances. Jake assisted with developing easement acquisition documents and coordinating solicitation and acquirement of over 300 easements for infrastructure installation on private property. Jake also assisted with the development of Civil design drawings and specifications and coordinated permitting and agency review of the project including Joint Application for Permit between NYSDEC and USACE, review and approval from NYS SHPO, NYSDOT, and other local municipality and agency reviews. T +1 716 362-8843 | E [email protected] www.ghd.com Page 158 of 301