GHD provided design and construction phase services
Recommendations for collection system
  for system repairs, which included:
improvements were based upon the most
cost-effective projects for abating SSOs. The final  –  Approximately 58,000 linear feet of cured in place
recommendations included a combination of SSES  lining of sanitary sewers
work, sewer lining, manhole rehabilitation, and lift  –  Approximately 15,000 linear feet of open cut
station capacity upgrades.  replacement for sewers with severe structural
GHD also prepared a Capacity Management  defects
Operations and Maintenance (CMOM) program for  –  Spot repairs at locations with minor defects
the Town. The CMOM program is a guideline for  –  Lateral repairs at locations where the lateral
ongoing collection system maintenance, including  connection to the main sewer is damaged
sewer cleaning, CCTV inspections, flow monitoring,
  –  Manhole rehabilitation including bench repairs,
and system testing. The NYSDEC approved the
  lining, and chimney seal
CMOM program and now enforces CMOM activities
through the Town's wastewater discharge permit.  –  Replacement of the 16-inch diameter, 2-mile-long
  Lift Station 8 forcemain.
GHD provided the following services:
  –  Replacement of two intermediate lift stations (LS-5
–  Pre-construction flow monitoring  and LS-11) and associated discharge forcemains,
–  System modeling  currently underway.
–  Alternative analysis for SSO reduction  At the conclusion of the repairs, post-construction flow
–  Workplan development  monitoring was performed to quantify the effectiveness of
  I/I reduction and subsequent SSO mitigation. Data
–  CMOM program development
  suggest the program has been successful in mitigating
–  Design and construction phase services for  up to 40 percent of wet weather I/I in several mini
  system repairs  systems.
–  Coordination with the NYSDEC and Order on
  Consent negotiations

The impact
A 10-year Workplan was developed for SSES work
within the collection system to identify and remove I/I
sources.
The first component of the Workplan included SSES
investigations through smoke testing, dye testing,
and CCTV inspection. More than 70,000 LF of
sewers were inspected with sizes ranging from 8 to
30 inches in diameter. Based on the results of the
inspections, recommendations were made for
system repairs.