Our response This project was very challenging due to construction As retained engineer for the Town, GHD along with constraints, location of existing utilities and the Water Department staff completed a series of field requirements of the reviewing agencies (New York State investigations to review existing conditions, establish Department of Transportation, Niagara County Highway, conceptual waterline alignments, and to gain a better State Parks, etc.) understanding of potential construction constraints. The project included four horizontal directional drill The Town authorized GHD in late 2017 to provide installations (Robert Moses and three creeks), nine bored survey, design, bidding and construction phase and cased road crossings, and one bored and cased services for the installation of 44,500 linear feet of 8-, railroad crossing. 12- and 16-inch diameter PVC pipe including 43 Construction of the project was completed in 2022. water system interconnections, 100 new hydrants, 100 new valves and 380 new water services of both residential and business services. ghd.com Page 183 of 301