Under our initial authorization, GHD prepared a Map, The impact Plan and Report for the Phase 16 extension, Upon construction completion, the Town of Royalton will completed the SEQR and SHPO coordinated have increased public water supply for its residents. reviews, along with surveying and a wetlands Residents along the project area will experience delineation which were provided by outside improved capacity, reliability, and pressure. consultants. GHD subsequently provided detailed design, which included the following in each area: – Approximately 15,620 LF (2.95 miles) of 8-inch polyvinyl chloride (PVC) pipe, valves, services, fire hydrants, and associated appurtenances on Ditch Road and Griswold Street between Foote Road and Lewiston Road (NYS Route 77). – Approximately 4,320 LF (0.82 miles) of 8-inch PVC pipe, valves, services, fire hydrants, and associated appurtenances on Akron Road from Bulmore Road to NYS Route 93. – Approximately 5,700 LF (1.08 miles) of 8-inch PVC pipe, valves, services, fire hydrants, and associated appurtenances on Akron Road from NYS Route 93 to Grove Road. GHD coordinated with various local, county and state agencies, and utilities to obtain permits and land use agreements for the project, and is currently providing construction contract administration and resident inspection. ghd.com Page 185 of 301