TO:  Honorable Town Board
FROM:  Jason Foote, Town Engineer
DATE:  January 26, 2026
SUBJECT:  Town Engineer re Grant funding update and planned grant strategy

Requested Action:  I wanted to provide an update on recent grant announcements and
  outline the Town’s plan moving forward for future grant applications.

  The Town was recently denied a 2025 WIIA Water grant for the
  replacement of water mains along Seneca Street and within Water
  District No. 2. In addition, the Town was denied a 2025 WIIA Sewer
  grant and a 2025 WQIP grant for the proposed Phase 9 Sanitary
  Sewer Project. The Town is requesting a formal debrief with NYSDEC
  and NYSEFC to better understand the scoring and evaluation process
  and to strengthen future applications.

  While it is certainly disheartening to be denied grant funding, the
  Phase 9 Sanitary Sewer Project must continue to move forward in
  order for the Town to remain in compliance with the existing Consent
  Order schedule. Accordingly, I recommend that the Town utilize
  remaining available funds from the Phase 8 project, together with
  budgeted sewer funds, to advance key components of the Phase 9
  project. These efforts would include construction of access roads,
  installation of flow meters, and procurement of a new SCADA system.

  For the upcoming year, I and requesting Town Board approval to
  proceed with submitting grant applications for the following
  recommended projects:

  • 2026 WIIA Water Grant – Consideration for replacement of the
  Orchard Park Road water main in advance of the NYSDOT project
  which is expected to be completed in 2027-2028. The water mains are
  listed on the ECWA recommended improvement list. Additionally,
  there should be consideration to upsize the sanitary sewer mains. The
  work could be completed as part of the DOT project as a betterment.
  • 2026 WQIP Sewer and 2026 WIIA Grant – Consideration for the
  replacement and upsize of the sanitary sewer mains along Orchard
  Park Road or for Phase 10 Sanitary Sewer Project which builds upon
  prior rehabilitation efforts and supports continued compliance with the
  Consent Order.