TECHNICAL/MANAGERIAL QUALIFICATIONS

and projects are frequently delivered at costs below  Water
typical market rates due to efficiencies gained through  Over half of the Town of West Seneca water system is
ongoing work and system familiarity.  located within the Erie County Water Authority (ECWA)
  Leased-Managed Area. Within this area, the Town is
Wastewater  responsible for the maintenance and replacement
CPL has played a central role in the planning, design,  of Water Mains and related infrastructure, including
and implementation of the Town’s NYSDEC Consent  valves and hydrants, and bears the full cost of these
Order sanitary sewer rehabilitation program, including  repairs despite not receiving water service revenues.
the completion of multiple phases of sewer lining,  ECWA provides the Town with a list of Water Mains
manhole rehabilitation, trunk sewer improvements,  recommended for replacement every two years. While
and associated mitigation efforts. This experience  numerous Water Main replacement projects have
provides a detailed understanding of completed work,  been completed over the years, new sections of Water
remaining system deficiencies, and the regulatory  Main are continually added to the system, which has
drivers shaping future sanitary sewer improvements.  limited the Town’s ability to reduce the overall number
  of required replacements. As a result, the number
Ongoing sanitary sewer work with the Town and  of Water Main replacements has remained relatively
NYSDEC continues to focus on planning and  consistent in recent years.
evaluating future mitigation projects, with an
increasing emphasis on private-side inflow and  CPL has worked closely with ECWA to advance the
infiltration reduction strategies, targeted rehabilitation,  transition of the Leased-Managed Area to direct ECWA
and cost-effective implementation. This depth of  service, with the long-term goal of transferring the
knowledge regarding Consent Order requirements,  entire water system to ECWA to reduce the Town’s
system performance data, and funding constraints  ongoing financial burden associated with water
allows for effective assistance in prioritizing projects,  system repairs. This transition is expected to occur
reducing overflows, and maintaining regulatory  incrementally, district by district, while maximizing
compliance.  available grant funding to minimize costs to water

  Town of West Seneca, NY - 48” Sewer Construction

  19