TOWN OF BOSTON – RESOLUTION NO. 2026 - 55

 NYS WATER INFRASTRUCTURE IMPROVEMENT ACT – 2026 NYS WATER GRANT

  WHEREAS, the Town of Boston, after thorough consideration of the various aspects of
the existing conditions, problems and review of available data for the Boston drinking water
system, has hereby determined that certain work, as described in the Town of Boston Water
System Improvements Phase 2 map, plan and report, is required to address the repair and
maintenance of the Boston drinking water system’s water main and pump station infrastructure.
The Town of Boston Water System Improvements Phase 2, herein called the “Project”, is
desirable, is in the public interest, and is required in order to implement the Project and address
said compliance requirements; and

  WHEREAS, the NYS Environmental Facilities Corporation (EFC) authorizes State
assistance to municipalities for drinking water quality improvement projects by means of a
contract, and the Town of Boston deems it to be in the public interest and benefit under this law
to enter into a contract therewith.

NOW, THEREFORE, BE IT RESOLVED

1. Supervisor Jason Keding, or his representative or successor in office, is the representative
  authorized to act on behalf of the Boston Town Board in all matters related to State
  assistance under the New York State Environmental Facilities Corporation (EFC) and/or any
  applicable State grant provisions.

2. The Supervisor, or his representative, is authorized to submit a 2026 NYS WIIA DW grant
  application in the amount of $10,090,000 of which the Town is requesting the maximum of
  $5,000,000 or 50% of the total Project cost in grant funding;

3. The Town of Boston Town Board agrees to fund its portion of the Project, approximately
  $5,090,000 of the Project total, by way of a General Obligation Bond or a series of Bond
  Anticipation Notes, and that funds will be made available to initiate the Project efforts within
  12 months of written approval of its application by the NYS Department of Health and the
  New York State Environmental Facilities Corporation authority;