Text · page 247 of 322
Read the whole document on one page (all 322 pages, each with its own heading)
C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No ✔ If Yes, what is the zoning classification(s) including any applicable overlay district? _________________________________________________________________________________________________________ Water main will be installed mostly in the public R.O.W. throughout the project. Zoning Classifications include R1: Single Family Res Dist, R2: Single Family Res Dist, R3: Two-or-more family Res. Dist., R4: Mobile Home Dist, C1: Local Retail Bus Dist, RC: General Res-Restricted Bus Dist. _________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? 9 Yes 9 No c. Is a zoning change requested as part of the proposed action? 9 Yes 9 No If Yes, i. What is the proposed new zoning for the site? ___________________________________________________________________ C.4. Existing community services. a. In what school district is the project site located? Hamburg ________________________________________________________________ Central School District, Springville-Griffith Institute Central School District, Eden Central School District b. What police or other public protection forces serve the project site? _________________________________________________________________________________________________________ County Sheriff, State Troopers c. Which fire protection and emergency medical services serve the project site? North Boston Volunteer Fire Company, Patchin Volunteer Fire Company, Boston Volunteer Fire Company __________________________________________________________________________________________________________ d. What parks serve the project site? __________________________________________________________________________________________________________ South Boston Park __________________________________________________________________________________________________________ D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? Municipal/Public _________________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ 3.64 acres b. Total acreage to be physically disturbed? _____________ 3.64 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ 3.64 acres c. Is the proposed action an expansion of an existing project or use? 9 Yes 9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 No iii. Number of lots proposed? ________ iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: _____ 18 months ii. If Yes: • Total number of phases anticipated _____ • Anticipated commencement date of phase 1 (including demolition) _____ month _____ year • Anticipated completion date of final phase _____ month _____year • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 3 of 13