f. Does the project include new residential uses?  9 Yes 9 No
 If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)
 Initial Phase  ___________  ___________  ____________  ________________________
 At completion
  of all phases  ___________  ___________  ____________  ________________________

 g. Does the proposed action include new non-residential construction (including expansions)?  9 Yes 9 No
 If Yes,
  i. Total number of structures ___________
  ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
  iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
 h. Does the proposed action include construction or other activities that will result in the impoundment of any  9 Yes 9 No
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
 If Yes,
  i. Purpose of the impoundment: ________________________________________________________________________________
  ii. If a water impoundment, the principal source of the water:  9 Ground water 9 Surface water streams 9 Other specify:
  _________________________________________________________________________________________________________
 iii. If other than water, identify the type of impounded/contained liquids and their source.
  _________________________________________________________________________________________________________
  iv. Approximate size of the proposed impoundment.  Volume: ____________ million gallons; surface area: ____________ acres
  v. Dimensions of the proposed dam or impounding structure:  ________ height; _______ length
  vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
  ________________________________________________________________________________________________________

 D.2. Project Operations
 a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? ✔  9 Yes 9 No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
 If Yes:
  i .What is the purpose of the excavation or dredging? _______________________________________________________________
 ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
  • Volume (specify tons or cubic yards): ____________________________________________
  +/- 5000 CY of excavated
  • Over what duration of time? ____________________________________________________
  18
 iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
Native________________________________________________________________________________________________________
  excavated material will be used as backfill in areas 5'+ off the edge of pavement. Excavated material from underneath pavement will be hauled
off-site________________________________________________________________________________________________________
  and select fill will be used as backfill.
  iv. Will there be onsite dewatering or processing of excavated materials?  9 Yes 9 No
  If yes, describe. ___________________________________________________________________________________________
  ________________________________________________________________________________________________________
  v. What is the total area to be dredged or excavated? _____________________________________acres  3.63
  vi. What is the maximum area to be worked at any one time? _______________________________  0.05 acres
 vii. What would be the maximum depth of excavation or dredging? __________________________  7 feet
 viii. Will the excavation require blasting?  9 Yes 9 No
 ix. Summarize site reclamation goals and plan: _____________________________________________________________________
N/A ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________

 b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment  ✔9 Yes 9 No
  into any existing wetland, waterbody, shoreline, beach or adjacent area?
 If Yes:
  i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
  description): Potential
  ______________________________________________________________________________________________
  unnamed wetland disturbance. Several crossings of tributaries to Eighteen Mile Creek are anticipated. All applicable
  environmental permits from NYSDEC and USACE will be obtained prior to the start of construction.
  _________________________________________________________________________________________________________
  Segment IDs: 0104-0039, 0104-0017