Southtowns Record

TB 2026-05-06 Agenda Packet

Government
Town of Boston
Board
Town Board
Meeting
May 6, 2026
Posted by publisher
May 22, 2026
Kind
Agenda packet
Topics
Budget and taxes, Water, sewer and drainage, Public safety, Zoning and land use, Parks and recreation, Audits and oversight, Roads and traffic, Energy and data center siting, Housing, Moratoriums

Original document

Same meeting

Text · page 249 of 322

Read the whole document on one page (all 322 pages, each with its own heading)

ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
  alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
  _________________________________________________________________________________________________________
Potential  temporary cut and fill activities may occur within minor tributaries and wetlands during watermain installation; however, no net
cut or_________________________________________________________________________________________________________
  fill is anticipated. Temporary disturbance within water bodies or wetlands will be limited to less than 0.10 acres. All affected areas
will be  restored to pre-construction conditions upon completion of the watermain installation.
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
  iii. Will the proposed action cause or result in disturbance to bottom sediments?  ✔ Yes 9 No
  If Yes, describe: __________________________________________________________________________________________
  Tributary to Eighteen Mile Creek crossings: directional drilling (preferred) or open-cut trenching.
  iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation?  9 Yes 9 No
  If Yes:
  • acres of aquatic vegetation proposed to be removed: ___________________________________________________________
  • expected acreage of aquatic vegetation remaining after project completion:________________________________________
  • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
  ____________________________________________________________________________________________________
  • proposed method of plant removal: ________________________________________________________________________
  • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
  v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
  _________________________________________________________________________________________________________
Potential  temporary cut and fill activities may occur limited to less than 0.10 acres. All affected areas will be restored to pre-construction conditions

 c. Will the proposed action use, or create a new demand for water?  9 Yes 9 No
  ✔
 If Yes:
  i. Total anticipated water usage/demand per day: __________________________  2500 gallons/day
  ii. Will the proposed action obtain water from an existing public water supply?  9 Yes 9 No
  ✔
 If Yes:
  • Name of district or service area: Erie  County Water Authority - Town is Lease Managed
  _________________________________________________________________________
  • Does the existing public water supply have capacity to serve the proposal?  9 Yes 9 No
  ✔
  • Is the project site in the existing district?  9 Yes 9 No
  ✔
  • Is expansion of the district needed?  9 Yes 9 No
  ✔
  • Do existing lines serve the project site?  9 Yes 9 No
  ✔
  iii. Will line extension within an existing district be necessary to supply the project?  ✔
  9 Yes 9 No
 If Yes:
  • Describe extensions or capacity expansions proposed to serve this project: ________________________________________
  Project proposes to replace mains where multiple breaks have occurred, and to supply the southern portion of the town with a secondary feed.
  ____________________________________________________________________________________________________
  • Source(s) of supply for the district: ________________________________________________________________________
  Chestnut Ridge Water Tank & Wohlhueter Water Tank
  iv. Is a new water supply district or service area proposed to be formed to serve the project site?  ✔9 Yes 9 No
 If, Yes:
  • Applicant/sponsor for new district: ________________________________________________________________________
  (T) Boston
  • Date application submitted or anticipated: __________________________________________________________________
  2027
  • Proposed source(s) of supply for new district: _______________________________________________________________
  Chestnut Ridge Water Tank & Wohlhueter Water Tank
  v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
Project_________________________________________________________________________________________________________
  intends to create a Town wide district.
  vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
 d. Will the proposed action generate liquid wastes?  9 Yes 9 No
 If Yes:
  i. Total anticipated liquid waste generation per day: _______________ gallons/day
  ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
  approximate volumes or proportions of each): __________________________________________________________________
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
 iii. Will the proposed action use any existing public wastewater treatment facilities?  9 Yes 9 No
  If Yes:
  •  Name of wastewater treatment plant to be used: _____________________________________________________________
  •  Name of district: ______________________________________________________________________________________
  •  Does the existing wastewater treatment plant have capacity to serve the project?  9 Yes 9 No
  •  Is the project site in the existing district?  9 Yes 9 No
  •  Is expansion of the district needed?  9 Yes 9 No

  Page 5 of 13