Southtowns Record

TB 2026-05-06 Agenda Packet

Government
Town of Boston
Board
Town Board
Meeting
May 6, 2026
Posted by publisher
May 22, 2026
Kind
Agenda packet
Topics
Budget and taxes, Water, sewer and drainage, Public safety, Zoning and land use, Parks and recreation, Audits and oversight, Roads and traffic, Energy and data center siting, Housing, Moratoriums

Original document

Same meeting

Text · page 250 of 322

Read the whole document on one page (all 322 pages, each with its own heading)

•  Do existing sewer lines serve the project site?  9 Yes 9 No
  •  Will a line extension within an existing district be necessary to serve the project?  9 Yes 9 No
  If Yes:
  • Describe extensions or capacity expansions proposed to serve this project: ____________________________________
  ____________________________________________________________________________________________________
  ____________________________________________________________________________________________________
 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?  9 Yes 9 No
  If Yes:
  •  Applicant/sponsor for new district: ____________________________________________________________________
  •  Date application submitted or anticipated: _______________________________________________________________
  •  What is the receiving water for the wastewater discharge? __________________________________________________
 v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
  receiving water (name and classification if surface discharge or describe subsurface disposal plans):
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
 vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________

 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point  9 Yes 9 No
  sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
  source (i.e. sheet flow) during construction or post construction?
 If Yes:
  i. How much impervious surface will the project create in relation to total size of project parcel?
  _____ Square feet or _____ acres (impervious surface)
  _____ Square feet or _____ acres (parcel size)
  ii. Describe types of new point sources. __________________________________________________________________________
  _________________________________________________________________________________________________________
 iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
  groundwater, on-site surface water or off-site surface waters)?
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
  • If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
  ____________________________________________________________________________________________________
  ____________________________________________________________________________________________________
  • Will stormwater runoff flow to adjacent properties?  9 Yes 9 No
 iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? 9 Yes 9 No
 f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel  9 Yes 9 No
  ✔
  combustion, waste incineration, or other processes or operations?
 If Yes, identify:
  i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
Heavy_________________________________________________________________________________________________________
  equipment, Trucks used during construction
  ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
N/A ________________________________________________________________________________________________________
  iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
N/A ________________________________________________________________________________________________________
 g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,  9 Yes 9 No
  or Federal Clean Air Act Title IV or Title V Permit?
 If Yes:
 i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet  9 Yes 9 No
  ambient air quality standards for all or some parts of the year)
 ii. In addition to emissions as calculated in the application, the project will generate:
  • ___________Tons/year (short tons) of Carbon Dioxide (CO2)
  • ___________Tons/year (short tons) of Nitrous Oxide (N2O)
  • ___________Tons/year (short tons) of Perfluorocarbons (PFCs)
  • ___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
  • ___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
  • ___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)

  Page 6 of 13