Text · page 106 of 121
Read the whole document on one page (all 121 pages, each with its own heading)
Jonathan Rink TO TO NEW PROPOSED OVERLAY WATER DISTRICT W W TOWN OF AURORA N N ORCHARD PARK O O FO F TOWN OF Plotted By: RC HAM HA BU EXISTING PUMP STATION EXISTING ECWA DIRECT SERVICE AREA R D RG (TYP. OF 3) PA TOWN OF HAMBURG RK TOWN OF ORCHARD PARK TOWN OF EDEN TOWN OF AURORA 12/9/2025 10:48 AM TOWN OF BOSTON TOWN OF COLDEN CPL | Architecture Engineering Plan 726 Exchange Street, Suite 920 Buffalo, NY 14210 Date last plotted: CPLteam.com PRIORITY #6: BACK CREEK ROAD REPLACE 4,500 LF OF 8" WM CRESTWOOD WATER STORAGE TANK PRIORITY #13: OLD ORCHARD DRIVE 8/11/2025 11:14 AM REPLACE 2,815 LF OF 6" WM TOWN OF BOSTON TOWN OF EDEN PRIORITY #7: BOSTON STATE ROAD REPLACE 5,600 LF OF 12" WM S:\Projects\Boston_T\Water Sys Rpts\D Design\Reports\Boston Water\2025 WIIA\Figures\Boston 2025 Proposed Improvements.dwg Date last accessed: PROJECT INFORMATION Project Number R25.17975.00 Client Name WOLHOETER WATER STORAGE TANK TOWN OF BOSTON Project Name PRIORITY #9: BACK CREEK ROAD 2025 WATER SYSTEM REPLACE 4,135 LF OF 8" WM IMPROVEMENTS Project Address BOSTON, NEW YORK PRIORITY #1: SECONDARY SOURCE OF WATER PRIORITY #4: BOSTON STATE ROAD REPLACE 2,730LF OF 12" WM TOWN OF COLDEN TOWN OF BOSTON SHEET INFORMATION Issued Scale 5/15/2025 1" = 4000' Drawn By Checked By JLM DGI Drawing Title LEGEND PRIORITY #8: BOSTON COLDEN ROAD & LANGO ROAD REPLACE 3,335 LF OF 8" AND 6" WM ALTERNATIVE 1 PROPOSE PROPOSED OVERLAY DISTRICT TOWN OF BOSTON IMPROVEMENTS PROPOSED WATER MAIN TOWN OF BOSTON TOWN OF NORTH COLLINS TOWN OF COLDEN TOWN OF CONCORD TOWN OF CONCORD TOWN OF CONCORD NORTH COLLINS EXISTING WATER MAIN TOWN OF EXISTING PUMP STATION Drawing Number Sheet size: 11x17 Drawing Name: EXISTING WATER STORAGE TANK RICE HILL WATER PRIORITY #14: EIGHTEENMILE CREEK CROSSING FIG STORAGE TANK ABANDON 8" WM UNDER CREEK 3