SJL Wetlands, LLC
  P.O. Box 47
  Warsaw, NY 14569
  716-912-7965

Areas outside of the “urban area” designation will be evaluated beyond 100 feet from the project area
to determine potential NYSDEC Article 24 jurisdiction.

SJL Wetlands LLC proposes to complete this scope of work for a lump sum of $12,666.00

Task 2: Recommendations for Restoration: SJL will provide general recommendations (via a
separate letter document from the Wetland/Stream Delineation Report) to support the proper
restoration of wetlands after the installation of the proposed project improvements. These
recommendations will include soil preparation and seeding recommendations for the affected area
upon completion of the installation of the various waterlines. This supplemental document will not
include recommendations relative to construction methods for the installation of the waterlines.

SJL Wetlands LLC proposes to complete this scope of work for a lump sum of $600.00

Task 3: Permitting and Agency Coordination: SJL is proposing a Not To Exceed (NTE) cost for
Time and Materials related to Agency Coordination and Permitting relative to Article 24 and
Section 404. This task may include attendance of virtual or in-person meetings with NYSDEC
and/or USACE during the permitting process, request for Jurisdictional Determinations from both
agencies and wetland boundary confirmation of the delineated wetlands, site visits with these
agencies to verify the wetland delineation, etc. This task does not include the preparation of a Joint
Application for Permit, or response to public comments relative to any application or wetland
mitigation plan unless time/funding allows within this Not to Exceed proposal cost. Under this task,
time will be billed at a rate of $150.00 per hour and material costs will be billed at cost, including
current federal mileage rates of $0.725/mile.

SJL Wetlands LLC proposes to complete this scope of work for a Not To Exceed cost of $5,000.00

TOTAL COST PROPOSAL: $18,266.00

NOTES:
 All work outside the described scope will be invoiced at $150/hour plus time and material expenses.
 Client is responsible for ensuring site access is approved by the landowner if you are not the
  landowner.
 Pricing is valid until May 1, 2026. If accepted, the work will be invoiced progressively thereafter
  and payment will be due within 15 days of invoice.
 Site conditions must be appropriate to complete the investigation (i.e. no snow cover)