Southtowns Record

TB 2026-01-21 Agenda Packet

Government
Town of Boston
Board
Town Board
Meeting
Jan 21, 2026
Posted by publisher
Apr 28, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Budget and taxes, Public safety

Original document

Same meeting

Text · page 102 of 107

Read the whole document on one page (all 107 pages, each with its own heading)

TOWN OF BOSTON TOWN BOARD
  RESOLUTION NO. 2026-14

 A RESOLUTION SUPPLEMENTING AND AMENDING RESOLUTION 2026-02 AND
  IMPLEMENTING TOWN CODE §§ 60-11 AND 60-12 REGARDING
  REIMBURSEMENT OF PROFESSIONAL REVIEW COSTS FOR FLOODPLAIN
  DEVELOPMENT PERMITS

  WHEREAS, by Resolution No. 2026-02, the Town Board adopted a Schedule of Fees
applicable to various permits, applications, and reviews administered by the Town of Boston; and

  WHEREAS, Town Code § 60-11 designates the Code Enforcement Officer as the Local
Administrator for purposes of administering and enforcing Chapter 60 of the Town Code, Flood
Damage Prevention; and

  WHEREAS, Town Code § 60-12 establishes a floodplain development permit and
requires that applications be accompanied by an application fee of $250; and

  WHEREAS, Town Code § 60-12 further provides that, in addition to the application fee,
an applicant shall be responsible for reimbursing the Town of Boston for any additional costs
necessary for review, inspection, and approval of a floodplain development project, and authorizes
the Local Administrator to require a deposit of no more than $500 to cover such additional costs;
and

  WHEREAS, certain floodplain development permit applications, including those
involving land clearing, grading, drainage alterations, and Stormwater Pollution Prevention Plans
(SWPPPs), require professional engineering or technical review to ensure compliance with
applicable federal, state, and local requirements;

  NOW, THEREFORE, BE IT RESOLVED, that the Town Board of the Town of Boston
hereby adopts the following, which shall supplement and amend Resolution 2026-02:

  1. Professional Review Determination. Where the Code Enforcement Officer, acting as Local
Administrator pursuant to Town Code § 60-11, determines that a floodplain development permit
application requires professional engineering or technical review in order to complete the review,
inspection, or approval of the project, the applicant shall be responsible for reimbursing the Town
for the actual and reasonable costs of such review.

  2. Deposit Authorized. Pursuant to § 60-12, the Code Enforcement Officer shall require the
applicant to submit a deposit, in an amount not to exceed $500, to be applied toward such
professional review costs.

  3. Application Fee Not Included. The deposit authorized by this Resolution is separate from
and in addition to the $250 floodplain development permit application fee required by Town Code
§ 60-12. The application fee shall not be credited toward, or included as part of, the deposit.