Transmission Line Deficiency
 (TLD) Line 520 – Lancaster
 Erie County, NY

Project Purpose and Need  Regional Benefits:
  • Improves system reliability by addressing identified
Transmission Line Deficiency (TLD) projects  deficiencies.
address issues identified through New York
State Electric & Gas (NYSEG)’s inspection  • Upgrades aging transmission infrastructure to maintain
programs, which flag transmission structures  dependable service.
and hardware needing repair or replacement
due to age, wear, or non-compliant  • Enhances resiliency during severe weather.
clearances.
  • Supports regional electric demand by strengthening
Proactively correcting these deficiencies  transmission performance
helps prevent outages, improves reliability,
and supports NYSEG’s commitment to  What to expect during construction:
modernizing infrastructure and maintaining
safe, dependable service.  • Increased construction vehicles in the work areas,
  including daily traffic as crews travel between material
  staging area and work areas.
TLD Program includes:
• Replacing aging structures, upgrading  • Traffic signs will be provided to indicate temporary
  hardware and conductors on lines such as  detour and pedestrian flow.
  115 kV, 34.5 kV, and 46 kV facilities,
  correcting clearance issues, and  • Ensure public safety by avoiding project work zones
  performing vegetation management along  and adhering to posted signage during construction
  work hours.
  identified segments
  • Service interruptions may occur, along with vegetation-
• TLD projects also involve improving access
  management activities such as tree trimming or
  and restoring right-of-way areas to support
  clearing.
  safe construction activities and maintain
  reliable electric service

  TLD is a NYSEG Effort Delivering More Reliable Power

  A Stronger, More  Powering Communities  Built With and
  Reliable Grid  across NY  for Communities

  Strengthens reliability across  Upgrading aging lines to meet  More than 170 years of service
  increasing transmission load  supporting New York
  all New York divisions
  requests  communities

  Reduces outages and  Reinforcing critical assets  Over 4,500 miles of existing
  improves system resilience  supporting rising energy  transmission infrastructure
  during severe weather events  demand and statewide growth  across NY State

  Supports safer operations  Powering healthcare facilities,  Supporting reliable service,
  and long-term grid  economies, and major  environmental responsibility,
  performance statewide for  manufacturers  and the communities we serve
  customers