Text · page 8 of 27
Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Proposed Bank Project Location (describe, and attach a location map): 1465 Union Road, West Seneca, NY 14224 Brief Description of Proposed Action: The proposed action consists of the construction of a 2,750 s.f., single-story bank with drive-thru. Site improvements will also include associated parking, storm water management, utility improvements, site landscaping and lighting. The site is 0.97 acres and zoned C-2(S). Name of Applicant or Sponsor: Telephone: 716-842-3165 Julius Aebly c/o Anthony J. Pandolfe, PE (Carmina Wood Design) E-Mail: [email protected] Address: 80 Silo City Row, Suite 100 City/PO: State: Zip Code: Buffalo NY 14203 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that ✔ may be affected in the municipality and proceed to Part 2. If no, continue to question 2. 2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES If Yes, list agency(s) name and permit or approval: Planning Board (site plan), ZBA (variance), ECWA (backflow) ✔ 3. a. Total acreage of the site of the proposed action? __________ 0.97 acres b. Total acreage to be physically disturbed? __________ 0.50 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 1.22 acres __________ 4. Check all land uses that occur on, are adjoining or near the proposed action: 5. Urban Rural (non-agriculture) Industrial ✔ Commercial ✔ Residential (suburban) □ Forest Agriculture Aquatic Other(Specify): □ Parkland Page 1 of 3 Page 8 of 27