Text · page 14 of 56
Read the whole document on one page (all 56 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Highway Department Monthly Report Weekly Duties-Summer Road maintenance and repair- pot hole repair, general road resurfacing and complete road milling/paving Repairjimprove damaged or sunken storm drains Crosswalk stripping- 26 crosswalks Biweekly garbage pickup- 39 garbage receptacles in the village Set up and weekly maintenance of 27 flower pots throughout the village Weekly mowing, weed trimming and clean up of 12 parks/parking lots and village guardrails Tree trimming, planting and tree removal Removal of sediment under South Chapel bridge Street sweeping- all village streets and parking lots Maintenance and cleaning of 2 amphitheaters Move brush from Palmer dump site to cemetery hill site July 9th -August 6th Removed large dead oak tree on Crestwood hill. DBNOARWNS Removed maple tree at 13 Caroline Removed 4 stumps on Caroline. Covered with topsoil and seeded. Patched potholes on Townsend and Beech Patched potholes on Center and N Water Repaired collapsed storm drain on Townsend. Dug out and paved 3 large water leak repairs on Palmer, Dawson and Maple Removed 2 damaged trees by the post office and several small dead trees in the business district . Skid paved Palmer between the tracks and Broadway so