Southtowns Record

​8/11/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Aug 11, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 33 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

@JS|HELD

  CONTINUED - Ball Room

 DESCRIPTION  QUANTITY  UNIT PRICE  TAX  O&P  RCV  DEPREC.  ACV

 114. Add for dustless floor sanding  847.52 SF  1.00  0.00  169.50  1,017.02  (847.52)  169.50
 WINDOWS  & DOORS
  115. Detach & Reset Window blind - PVC  4.00 EA  44.31  0.00  35.44  212.68  (0.00)  212.68
 - 1"- 14.1 to 20 SF
 MISCELLANEOUS
 116. Mask wall - plastic, paper. tape (per  172.31 LF  2.02  0.00  69.62  417,69  (46.41)  371.28
 LF)
 117. Final cleaning - construction -  847.52 SF  0.54  0.00  91.54  $49.20  (9.00)  549.20
 Commercial  vo  "
 118. Content Manipulation charge - per  8.00 HR  108,75  0.00  174.00  1,044.00  (0.00)  1,044.00
 hour

 Totals:  Ball Room  0.00  2,469.98  14,819.83  10,543.29  4,276.54

  Locker Room 1  Height: 11'

  447.67  SF Walls  202.90 SF Ceiling
  650.57  SF Walls & Ceiling  202.90 SF Floor
  22.54  SY Flooring  54.93 LF Floor Perimeter
  28.78  LF Ceil. Perimeter

 Missing Wall - Goes to Ceiling  16" 5" X 3° 5"  Opens into BALL_ROOM
 Door  .  2° 7 1/2" X 6! 7/16"  Opens into BALL_ROOM
 Window  3° 6 5/16" X 5° 2"  Opens into Exterior
 Window  3° 6 5/16" X 5' 2"  Opens into Exterior
 Window  3° 9 7/16" X 4" 7 1/8"  Opens into Exterior
 Window  3° 9 7/16" X 4' 7 1/8"  Opens into Exterior
 Missing Wall - Goes to Ceiling  12’ 4 5/16" X 3° 5"  Opens inte FILE_STORAGE

 DESCRIPTION  QUANTITY  UNIT PRICE  TAX  O&P  RCV  DEPREC,  ACV
 WALLS
 119. Thin coat plaster (no lath)  223.84 SF  6.77  0.00  303 08  1,818.48  {202.05)  1,616.43
 120. Plasterer - per hour  9.00 HR  142.19  0.00  255.94  1535.65  (0.00)  1,535.65
 121. Seal part of the walls w/PVA primer -  223.84 SF  0.86  0.00  38.50  231.00  (192.50)  38.50
 one coat
 {22. Paint the walls - two coats - 2 colors  447.67 SF  1,82  0.00  162.96  977,72  (814.76)  162,96
 FLOORING
 123. Sand, stain, and finish wood floor  202.90 SF  762  0.00  309.22  1,855.32  (1,546.10)  309.22

GOWANDA  6/12/2026  Page: 13