Southtowns Record

​8/11/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Aug 11, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 36 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Opinion of Probable Construction Cost Delta Report
Project Name:  Gowanda  (V) Emergency Storm Damage  Repairs
Project Owner:  Village of Gowanda
Project Location:  Gowanda, NY
Wendel Project Number:  394024
Phase:  Delta Report
Dat  june 25, 2026
first Floor ©
  FIRST FLOOR ENTRY  $  1,705.44  "2,220.00  0.00
  FIRST FLOOR  HALLWAY _  $  2,053.92  2,060.00  0.00
  MAIN OFFICE  $  919.38  1,978.00  0.00
  HVAC ROOM  $  22,902.00  7,121.00  0.00
  DISPATCH  $  15,747.60  17,940.00  5,181.19
  OFFICE BEHIND DISPATCH  $  22,245.30  25,768.00  6,733.31
  BOOKING  ROOM  $  12,658.14  16,861.00  4,420.67
  BOARD  ROOM  $  380.16  1,512.00  0.00
‘Second Floor  :  oe  rrrrr——  re  ee
  SECOND  FLOOR ROOM  MAIN BLUIDING  $  144,244.32  131,921.20  74,323.53
  RECORDS ROOM  ;  $  15, 997.74  5,850.00  _ 4,948.70
Eger  _.  a  Oe
  EXTERIOR-MAIN BUILDING  $  “43, 917.20  16,800.00  4,486.22
 ROOF  $  179,467,20  136,384.00  156,178.50
 REAR BUILDING  $  173,747.20  183,710.00  55,746.33
  Inc above  Inc above  32,434.24
  Not inc  Not Inc  31,358.44
  Abatement Allowance
Assumptions/Exclusions:  "he:  ay
Wendel’s estimate includes an allowance for hazardous materials abatement, it is not included in the total cost but cartled below the
line for reference; The hazardous materials report is not finalized at this time, however based on initial findings, the project is
expected to require abatement.  (**)