Text · page 36 of 56
Read the whole document on one page (all 56 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Opinion of Probable Construction Cost Delta Report Project Name: Gowanda (V) Emergency Storm Damage Repairs Project Owner: Village of Gowanda Project Location: Gowanda, NY Wendel Project Number: 394024 Phase: Delta Report Dat june 25, 2026 first Floor © FIRST FLOOR ENTRY $ 1,705.44 "2,220.00 0.00 FIRST FLOOR HALLWAY _ $ 2,053.92 2,060.00 0.00 MAIN OFFICE $ 919.38 1,978.00 0.00 HVAC ROOM $ 22,902.00 7,121.00 0.00 DISPATCH $ 15,747.60 17,940.00 5,181.19 OFFICE BEHIND DISPATCH $ 22,245.30 25,768.00 6,733.31 BOOKING ROOM $ 12,658.14 16,861.00 4,420.67 BOARD ROOM $ 380.16 1,512.00 0.00 ‘Second Floor : oe rrrrr—— re ee SECOND FLOOR ROOM MAIN BLUIDING $ 144,244.32 131,921.20 74,323.53 RECORDS ROOM ; $ 15, 997.74 5,850.00 _ 4,948.70 Eger _. a Oe EXTERIOR-MAIN BUILDING $ “43, 917.20 16,800.00 4,486.22 ROOF $ 179,467,20 136,384.00 156,178.50 REAR BUILDING $ 173,747.20 183,710.00 55,746.33 Inc above Inc above 32,434.24 Not inc Not Inc 31,358.44 Abatement Allowance Assumptions/Exclusions: "he: ay Wendel’s estimate includes an allowance for hazardous materials abatement, it is not included in the total cost but cartled below the line for reference; The hazardous materials report is not finalized at this time, however based on initial findings, the project is expected to require abatement. (**) yeyLarfay ) Ng