Text · page 39 of 56
Read the whole document on one page (all 56 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Opinion of Prebable Construction Cost Project s Gowands (V} Emergency Storm Damage Repaits Village of Gowanda cation: Gowanda, KY Wendel Project “wendel 394024 Second Fioor June 25, 2026 ee "42,000.00 $ OO sr eee Rinne Sc Demo of zs| 26,024 New Second Figor 6 30,037 Window Vertical Blinds ~ Second Floor 4,200.60 280 0.00 Hardwood Floor Strip, Sand and Refinish 26,024 26,500.00 0.00 0.0G 9,982.40 1048 L774.00 0.09 0.00 356 ig and moving - Ins 365. 3,285 $ 650.00 $ i300 $ 325.00 $ 1300 ¢ Records Rosin: OO je penines es bid above aes eee eae 700.00 $ 2,800 $ iooeoe te