Text · page 32 of 90
Read the whole document on one page (all 90 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Gowanda Water Department MONTHLY BOARD REPORT Gowanda- Processed 9,074,000 gallons for the month of September for a daily average of 302,500 gallons. 18 Ufpo. Processed 2 work orders. Read meters. Posted a shutoff notice on Erie Ave. Picked up fluoride at Amrex Chemical in Buffalo as none was available at the usual supplier, Slack Chemicals. Leak found on Jamestown Street with the help of the postal carrier. Property owner notified it was on their side of the curb box. NY Rural Water helped pinpoint water leak on Dawson Drive as well as Caroline Rd. Water leak repaired on Caroline that was approximately 50gpm and causing issues in the Valu parking lot. Followed up with the manager at Valu about the water issues in the parking lot caused by the leak on Caroline. Cleared out debris above the spring at Point Peter Reservoir. Sam completed on-site assessment and obtained license. Kirk Smuda and Jamie Wilson completed the IIA/B course at SUNY Fredonia. Collins 1- Processed 2,411,000 gaiions for a daily average of 80,400 gallons. 17 Ufpo. Read meters. Landscaped 2 old leak repair locations. Lagoon and Highway Department samples taken. POC (Principal Organic Chemicals) samples taken. Water valve at the well repaired. Chlorine injector replaced at the well. Leaking valve repaired in front of the LK Painter Center. Collins 3- Processed 664,383 gallons for a daily average of 21,432 gallons. Lead and Copper sample results given to residents at the sample locations, SOC (Synthetic Organic Chemicals) samples taken. Cleaned up area on N. Division Rd. from the location of the old water leak.