Southtowns Record

TBA02.23.2026packet

Government
Town of West Seneca
Board
Town Board
Meeting
Feb 23, 2026, 6:00 p.m.
Posted by publisher
Feb 21, 2026
Kind
Agenda packet
Topics
Budget and taxes, Water, sewer and drainage, Zoning and land use, Public safety, Parks and recreation, Roads and traffic, Audits and oversight, Housing, Moratoriums, Short-term rentals

Original document

Same meeting

Text · page 63 of 192

Read the whole document on one page (all 192 pages, each with its own heading)

285 Delaware Avenue, Suite 500
Buffalo, New York 14202
United States
ghd.com

Our ref: 12681649
  Original Sent Via Email

February 18, 2026

Jason Foote, PE
Town of West Seneca
Engineering Department
1250 Union Road
West Seneca, NY 14224

Proposal | Sewer Model Recalibration and SSES Re-Evaluation

Dear Mr. Foote:
GHD is pleased to submit this proposal to the Town of West Seneca (Town) for professional engineering
services in connection with the above-referenced project.

Project Understanding
The Town owns and operates a sewer system with pipes ranging in size from 8 to 48 inches in diameter. Flow
generally goes from the east at Transit and Leydecker Roads to an interconnection along the City of Buffalo
line. Flow from Erie County Sewer District (ECSD) No. 3 enters the Town system from the southwest and ties
into the main 36-inch trunkline that follows Cazenovia Creek. The northwestern portion of the Town also has
some satellite sewers that are not connected to the main system and connect to the City of Buffalo and
ECSD No. 1 on the north side of Cazenovia Creek.
The Town has been administering a program of sewer rehabilitation with the goal of mitigating infiltration and
inflow (I/I). This program has completed its eighth year, which included lining the main trunkline that follows
Cazenovia Creek to the interconnection with the Buffalo Sewer Authority. It is anticipated that this work will be
complete by Spring 2026. Following project completion, the Town intends to modify their approach to overflow
mitigation by recalibrating the sewer model, re-prioritizing work areas, and determining if capital improvements
will be more effective at mitigating overflows.
GHD prepared an initial evaluation for the Town, which was presented to the NYSDEC in October 2024. This
evaluation used a genetic algorithm to identify a framework for projects that are expected to mitigate overflows
within the Town. The framework included lateral lining and additional I/I source reduction to address overflows
upstream of West Seneca’s interconnection with the Buffalo Sewer Authority. Upsizing the sewer on Orchard
Park Road was also identified as a feasible project that would have a positive effect on overflow occurrences.
The NYSDEC has indicated they agree that the approach needs to be modified but suggested that there is
enough uncertainty to warrant an updated model calibration based on the last calibration date.