Text · page 21 of 81
Read the whole document on one page (all 81 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Summary of Payment Payment Invoice Church St. Over Tannery Brook Culvert Replacement Description The project is a culvert replacement with a precast concrete box culvert and precast concrete wing walls. Medium stone fill will be placed in the vicinity of the wing walls and along Tannery Brook. The vertical concrete parapets will be replaced with a steel pedestrian/bicycle rail. The sidewalk, curb and ramps will be replaced. The road will incorporate full-depth pavement reconstruction. The proposed work will be performed while traffic is maintained via an offsite detour. Payment Number 5 Pay Period 12/24/2025 to 07/06/2026 Prime Contractor Oakgrove Construction Inc. Payment Status Pending Awarded Project Amount $968,322.26 Authorized Amount $925,890.99 Adjustment Remarks No Liquidated Damages 0650 640.11020004 LF 318.150 $2.000 $636.30 | WHITE PAINT REFLECTORIZED PAVEMENT MARKING - 20 MILS(SPECIAL STRIPES) Section Total: $636.30 Project Total: $636.30 Payment Invoice: 67/06/2026 Church St. Over Tannery Brook Culvert Replacement Page 1 of 2