Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Roads and traffic, Audits and oversight, Parks and recreation, Energy and data center siting

Original document

Same meeting

Text · page 21 of 81

Read the whole document on one page (all 81 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Summary of Payment
  Payment Invoice
  Church St. Over Tannery Brook Culvert Replacement

  Description  The project is a culvert replacement with a precast concrete box culvert and precast concrete wing walls.
  Medium stone fill will be placed in the vicinity of the wing walls and along Tannery Brook. The vertical
  concrete parapets will be replaced with a steel pedestrian/bicycle rail. The sidewalk, curb and ramps will
  be replaced. The road will incorporate full-depth pavement reconstruction. The proposed work will be
  performed while traffic is maintained via an offsite detour.

  Payment Number  5

  Pay Period  12/24/2025 to 07/06/2026
  Prime Contractor  Oakgrove Construction Inc.

  Payment Status  Pending

 Awarded Project Amount  $968,322.26
  Authorized Amount  $925,890.99
  Adjustment Remarks  No Liquidated Damages

0650  640.11020004  LF  318.150  $2.000  $636.30 |
WHITE PAINT REFLECTORIZED PAVEMENT MARKING - 20 MILS(SPECIAL STRIPES)

  Section Total: $636.30

  Project Total: $636.30

Payment Invoice:  67/06/2026
Church St. Over Tannery Brook Culvert Replacement  Page 1 of 2